Once the frame is secure, take the Pressure Treated Spikes (

PT-01

) and fix them to the 

frame using 

S70

 screws.

Once they have all been fixed in place use a mallet to push the frame firmly into the 

ground. Ensure the soils is suitable for anchoring the base and the spikes are under the

ground.

The base should be level with the ground and all spikes should be fully embedded in the

soil to prevent the base being lifted out of the ground and prevent entrapment.

A spirt level should be used to ensure that your base level, ready for the building to be

built on top.

For Queries and Help please access our Support Centre:

 www.gardenbuildingsdirect.co.uk/help

S100

S100

S100

S100

S100

S100 S100

S100S100

S100

Front

15734

15734

15734

15734

15734

S100

S100

S100

S100

Front

15737

15737

15734

15734

If you have not purchased our playhouse Eze Base platform please skip to the next page.

Firstly, decide where you want to have your building in your garden. Take one of the

shorter Gable Joists (

15737

), which is 

2105mm

 in length, and place on the ground on its 

shorter side. 

Take one of the longer Side Joists (

15734

). This will be 

2561mm

 and position it at a 

90

degree

 angle to the first joist (

15737

), ensuring it fits against the side.

Drill a pilot hole and screw it together with an 

S100

 screw

S100

15737

15734

2105mm

S100

S70

S70

S70 S70

S70

S70

S70 S70

S70

Align floor

to back

FSS

S70

S70

S70

S70

S70

S70

S70

S70

S70

FSS

FSS

6

Place another Side Joist (

15734

) on the opposite side and the other Gable Joist (

15737

on the end, making a rectangle. Drill pilot holes and fix the joists together using 

S100

 screws.

Place the remaining Side Joists (

15734

) in the frame you have created ensuring they are

equally spaced. Drill pilot holes in the ends and fix in place with 

S100

 screws.

Now place the second floor section up against the first ensuring that it fits tightly and there

are no gaps. Drill the pilot holes and fix in place with 

S70

 screws.

Now your building is ready to assemble. Continue to the next page and start on stage 8 

for your building assembly stages.

Now that the base is firmly in the ground, take the the first playhouse floor section (

FSS

)

and align it to the back of the base. It should sit perfectly flush with the Gable Joist.

Once floor is in position, pilot drill the holes and fix the floor in place with 

S70

 screws.

Summary of Contents for INS-0072

Page 1: ...ions Please read the instructions carefully and please retain for future reference Please note that all images are for illustration purposes only For Queries and Help please contact Product Support 01...

Page 2: ...thinking of modifying this building be aware that any modifications invalidate your warranty and may affect your consumer rights We do not recomend fitting optional building parts such as a base from...

Page 3: ...with the fixing kit for safer transportation If they are still not found please visit our Support Centre www gardenbuildingsdirect co uk help Q What tools do I require A Drill with 4 5 3 and 2mm drill...

Page 4: ...TY x 2 FSS Floor SS or T G 1052 5mm x 1465mm EP Eaves Purlin R4C 28x28 0879 SQ QTY x 4 CP Centre Purlin R4C 28x28 1465 SQ QTY x 1 FI Final 14471 QTY x 2 FB Fascia Board 14468 QTY x 4 25877 QTY x 2 WP...

Page 5: ...ase 9ft Deep L2561 7 15734 Eze Base 7ft Gable L2105 2 15737 38mmx38mm Pressure Treated Spike 4 PT 01 11mm x 68mm Square Boards 13 SQ 01 PT 01 38mmx38mm Pressure Treated Spike QTY x 4 SQ 01 11mm x 68mm...

Page 6: ...ere to nd everything HANDY TIP Sort xings and wood kit by size and piece before starting Use a suitable drill bit for pilot hole 3mm is recommended for most 3mm or 4mm Avoid splitting wood by pre dril...

Page 7: ...ground on its shorter side Take one of the longer Side Joists 15734 This will be 2561mm and position it at a 90 degree angle to the first joist 15737 ensuring it fits against the side Drill a pilot h...

Page 8: ...r with 50mm screws S50 Repeat this process for the front Plain Gable Apex PG Tip Pre drillallholesbeforefixing PGL PGL PG PGR PGR S50 S50 S50 PP On the ground fix the rear Gable Apex PGL PGR to the Pl...

Page 9: ...ixed to the front of the Roof Panels RSS Tip Useoneofthepurlinstodrawalinealongtheboardtohelplocatewherethepurlinwillbe whenfixingtheminplace N30 N30 EP RSS The opposing front roof panels should look...

Page 10: ...sides and gables of the playhouse Make sure a nail penetrates the Centre Purlin CP at each end of the Roof Panel RSS Tip Usethisstagetosquareyourbuilding Door Gable N30 N30 N30 N30 Top View S50 S50 S...

Page 11: ...to outside of the door Metal Catch is fixed to the inside of the door S10 MC S25 MC 26 27 S30 DSB DSB DG DG Fix a Door Safety Block DSB to the Door Gable DG from the inside of the bulding using 30mm...

Page 12: ...Y x 2 21524 or 21523 34 21523 21524 level at side Front 21523 21524 or 21523 S50 S50 S50 S50 Front Picket Fence No Base Place the second length of decking next to the first ensuring there is a distanc...

Page 13: ...G WUXVV XVLQJ PP 6FUHZV 6 XW RXW WKH ODVW ERDUG WR XVK RQ HDYHV ZDOO S30 80mm Cut and lay the board L 1758mm aligned to the tip of the Gable Fix the board using 30mm Screws S30 See the image above S30...

Reviews: