Once the frame is secure, take the Pressure Treated Spikes (
PT-01
) and fix them to the
frame using
S70
screws.
Once they have all been fixed in place use a mallet to push the frame firmly into the
ground. Ensure the soils is suitable for anchoring the base and the spikes are under the
ground.
The base should be level with the ground and all spikes should be fully embedded in the
soil to prevent the base being lifted out of the ground and prevent entrapment.
A spirt level should be used to ensure that your base level, ready for the building to be
built on top.
For Queries and Help please access our Support Centre:
www.gardenbuildingsdirect.co.uk/help
S100
S100
S100
S100
S100
S100 S100
S100S100
S100
Front
15734
15734
15734
15734
15734
S100
S100
S100
S100
Front
15737
15737
15734
15734
If you have not purchased our playhouse Eze Base platform please skip to the next page.
Firstly, decide where you want to have your building in your garden. Take one of the
shorter Gable Joists (
15737
), which is
2105mm
in length, and place on the ground on its
shorter side.
Take one of the longer Side Joists (
15734
). This will be
2561mm
and position it at a
90
degree
angle to the first joist (
15737
), ensuring it fits against the side.
Drill a pilot hole and screw it together with an
S100
screw
S100
15737
15734
2105mm
S100
S70
S70
S70 S70
S70
S70
S70 S70
S70
Align floor
to back
FSS
S70
S70
S70
S70
S70
S70
S70
S70
S70
FSS
FSS
6
Place another Side Joist (
15734
) on the opposite side and the other Gable Joist (
15737
)
on the end, making a rectangle. Drill pilot holes and fix the joists together using
S100
screws.
Place the remaining Side Joists (
15734
) in the frame you have created ensuring they are
equally spaced. Drill pilot holes in the ends and fix in place with
S100
screws.
Now place the second floor section up against the first ensuring that it fits tightly and there
are no gaps. Drill the pilot holes and fix in place with
S70
screws.
Now your building is ready to assemble. Continue to the next page and start on stage 8
for your building assembly stages.
Now that the base is firmly in the ground, take the the first playhouse floor section (
FSS
)
and align it to the back of the base. It should sit perfectly flush with the Gable Joist.
Once floor is in position, pilot drill the holes and fix the floor in place with
S70
screws.