background image

16997

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

STOP!

Flexible schedule 

No selling,

just building

Bonus incentives 

available

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request
Answers to frequently asked questions
Live chat with an agent

Summary of Contents for HEARTLAND MIDTOWN 8x10

Page 1: ...enjoy building your shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK STOP Flexible schedule No selling just building Bonus incentives available INSTALLERS WANTED based on number of completed installations...

Page 2: ...This page intentionally left blank...

Page 3: ...d to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 9 CHECK ALL PA...

Page 4: ...Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible P...

Page 5: ...3 cm SBA x1 2 x 4 x 18 1 2 5 1 x 10 2 x 47 cm NCA x4 2 x 4 x 24 5 1 x 10 2 x 61 cm RL 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1 GAA x2 19 32 x 2 1 2 x 22 5 8 2 5 x 6 3 x...

Page 6: ...thick x2 7 16 x 48 x 96 1 1 x 121 9 x 243 2 cm x2 7 16 x 23 7 8 x 48 1 1 x 60 6 x 121 9 cm x2 7 16 x 9 3 4 x x 96 1 1 x 24 8 x 243 2 cm x2 7 16 x 9 3 4 x x 23 7 8 1 1 x 24 8 x 60 6 cm WALL PANELS DOO...

Page 7: ...x8 1 2 5 cm 1 1 4 3 2 cm x1 55 7 8 Metal Threshold 3 4 1 9 cm x10 Bagged seperately special coating PARTS LIST continued NOTE If you are using a nail gun nails may be used where screws are shown for q...

Page 8: ...EINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list...

Page 9: ...lates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure...

Page 10: ...x 96 1 6 x 121 9 x 243 8 cm x3 x1 x36 x36 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 40 Nails 3 7 6 cm Hot Dipped Galvanized Box Type Nails 3 7 6 cm 2 5 1 cm 3 7 6 cm MATERIAL REQUIRED Cut...

Page 11: ...n see page 7 CONCRETE Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recommended LEVELING MATERIALS Gr...

Page 12: ...1 1 2 3 8 cm Center on marks Flush Flush 3 7 6 cm Nails 3 7 6 cm x36 PARTS REQUIRED FLOOR FRAME Look for Stamp TREATED HINT For easier nailing stand on frame 1 Arrange parts as shown on flat surface M...

Page 13: ...ment will be approximately 153 11 16 390 4 cm When the frame is level and square secure one side of frame to the 4x4 runners with one fastener at ends of each runner Move to the opposite end of the fr...

Page 14: ...els are 5 8 1 6 cm thick Install 1 48 x 96 panel on the wall frame as shown Use the gauge block to mark the 3 4 side measurement floor joist Secure panel with 2 2 nails in the corners Fig A 2 Move to...

Page 15: ...on edges and 12 apart inside panels Install 1 23 7 8 x 96 panel flust to installed panel Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 3 4 x167 2 5 1 cm FLOOR PANELS Flush Flu...

Page 16: ...e floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during t...

Page 17: ...121 9 cm 243 8 cm 182 9 cm 243 8 cm 301 cm 61 cm 243 8 cm 172 7 cm 1 1 2 3 8 cm 3 7 6 cm 3 7 6 cm Nails UM x6 TP RL RL TP SEAM Flush Flush Flush Flush DOOR x2 2 x 4 x 24 5 1 x 10 2 x 61 cm RL TP x2 2...

Page 18: ...121 9 x 213 4 cm PARTS REQUIRED x1 x45 2 5 1 cm 3 2 3 4 GAUGE BLOCK Install 1 48 x 72 panel on the wall frame as shown Use the gauge block to mark the 3 4 side measurement on the wall stud Secure pane...

Page 19: ...nside panel 4 Your side walls are now assembled FINISH 48 x 72 121 9 x 213 4 cm x1 x1 x77 SIDE WALL PANELS PARTS REQUIRED 2 5 1 cm Carefully flip the side wall over Repeat steps to build your second s...

Page 20: ...oor Measure and mark Secure with 2 3 nails at each mark x5 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x2 2 x 4 x 89 5 1 x 10 2 x 226 1 cm SZ 18 20 1 2 44 1 2 68 1 2 89 66 1 2 52 1 cm 113 cm 174 cm 226 1 cm 1...

Page 21: ...ng edges and 12 apart on inside of panel Install all panels with the primed side facing up 19 BACK WALL PANELS 3 4 GAUGE BLOCK Your back wall is now assembled FINISH 3 4 GAUGE BLOCK 6 15 2 cm 12 30 5...

Page 22: ...ier nailing stand on frame 16 1 2 41 9 cm 16 1 2 41 9 cm 16 1 2 41 9 cm 16 1 2 41 9 cm x1 2 x 4 x 89 5 x 10 2 x 226 1 cm SZ PARTS REQUIRED 3 7 6 cm x16 FRONT WALL BEGIN 1 Secure with 2 3 nails at each...

Page 23: ...cm PARTS REQUIRED FRONT WALL x60 x2 2 5 1 cm OO 3 7 6 cm Install all panels with the primed side facing up Install 2 19 7 8 x 72 panels onto wall frame as shown Secure panel with 2 nails spaced 6 apa...

Page 24: ...R 2 You have finished standing your right side wall FINISH 3 Install OO as a temporary brace Secure with 2 3 screws Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A 6 15 2 cm Center right side...

Page 25: ...floor with 3 nails Fig C Secure panel to side wall stud with 1 1 2 nails ENSURE PANEL CORNERS ARE FLUSH Your back wall is now installed FINISH 3 7 6 cm Nails 2 5 1 cm x18 1 1 2 3 8 cm x11 2 5 1 cm x2...

Page 26: ...LL INSTALLATION Install left wall securing with 1 2 screw through back wall panel into side wall bottom and top plates Fig B Fig A ENSURE PANEL CORNERS ARE FLUSH BEGIN 1 2 5 1 cm x2 Flush 2 5 1 cm Scr...

Page 27: ...ed 6 apart Your left side wall is now installed FINISH 6 15 2 cm 3 7 6 cm Nails 1 1 2 3 8 cm x11 Secure gable wall top plate with 1 3 screw angled into top plates Fig D 4 2 Nail side wall panels to fl...

Page 28: ...Secure wall bottom plates to floor with 3 nails Fig C ENSURE PANEL CORNERS ARE FLUSH Your front wall is now installed FINISH REMOVE TEMPORARY BRACING 2 5 1 cm x10 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS R...

Page 29: ...ED FRONT WALL HEADER CENTER CENTER 3 7 6 cm x5 3 7 6 cm Screws Flush to panel edge Flush Front wall panel OY SZ OY Fig A x1 OY 2 x 3 x 72 5 1 x 7 6 x 213 4 cm BEGIN 1 Center OY on SZ flush to edge of...

Page 30: ...IES WITH ONLY ONE GUSSET ATTACHED 3 2 x120 2 5 1 cm Gusset 1 4 6 3 mm GAP 1 4 6 3 mm GAP 2 5 1 cm Nails 12 per side Center x10 6 x 24 15 2 x 61 cm OSB OR WOOD GRAIN x12 2 x 4 x 54 1 16 5 1 x 10 2 x 13...

Page 31: ...Note single gusset rafters at front back walls with gusset facing inward Secure single gusset rafters to top plate with 1 3 screw in each rafter end Fig C Fig A Align over studs Install end rafters F...

Page 32: ...cm 3 4 1 9 cm Place left gable panel on SBA Secure with 1 1 2 nails as shown 1 BEGIN 2 Place right gable panel flush to left panel Secure with 1 1 2 nails as shown Flush SBA on flat 1 1 2 3 8 cm Nail...

Page 33: ...A 3 7 6 cm Screws NAIL FIRST 1 1 2 3 8 cm 2 Continue nailing lower edge of panels into top plate with 1 1 2 nails spaced 6 apart Secure panels to rafter with 1 1 2 nails spaced 6 apart Working inside...

Page 34: ...l panels with the primed side facing up x1 2 x 4 x 18 1 2 5 1 x 10 2 x 47 cm NCA 1 3 4 4 5 cm 2 3 8 6 0 cm Place left gable panel on NCA Secure with 1 1 2 nails as shown 1 BEGIN 2 Place right gable pa...

Page 35: ...e and Mark 3 4 19 1 mm Measure and Mark 6 15 2 cm 3 NAIL FIRST 1 1 2 3 8 cm Front Gable Unit x40 1 1 2 3 8 cm Continue nailing lower edge of panels into top plate with 1 1 2 nails spaced 6 apart Secur...

Page 36: ...ble panel Fig C Secure panel with 2 2 nails in the corners 2 1 BEGIN Install 1 48 x 96 panel with a 3 4 measurement on the rafter Fig A Fig B Secure panel with 2 2 nails in the corners m o v e Two Nai...

Page 37: ...23 7 8 roof panel flush to installed panel and flush at rafter peak Fig B Secure with 2 2 nails into panel corners as shown 3 Two Nails Two Nails 4 Move to the opposite end of panel Maintain panel flu...

Page 38: ...with 1 2 nail into each rafter Fig D 5 6 Flush Flush Flush Flush Install 23 7 8 x 48 and 9 3 4 x 96 roof panels flush to installed panels as shown Secure roof panels with 2 nails spaced 6 apart along...

Page 39: ...with 2 finishing nails in pattern shown Repeat steps to install the back gable trim Install 4 FA projecting out past edge of OSB roof panels two on each side of roof as shown Fasten each with 2 finish...

Page 40: ...ED EAVE SOFFIT Place parts OY and EFC flush to bottom of roof overhang and wall panel as shown Fig A Secure with 1 1 4 screws in the pattern shown FINISH You have finished installing your eave soffits...

Page 41: ...fascia boards ROR and DKB as shown Fig A Secure with 2 finishing nails You have installed your eave fascia FINISH ROR ROR DKB DKB 2 5 1 cm Finishing Nails Fig A Flush to roof panels and soffit x2 19 3...

Page 42: ...2 cm OO GAA 4 3 7 6 cm Screws 1 1 4 3 2 cm Screws 3 8 1 cm 3 8 1 cm RED Bottom edges Flush GREEN 3 8 1 cm OFFSET OFFSET 3 8 1 cm 69 175 3 cm Door Stiffener Arrange parts as shown on flat surface Ensu...

Page 43: ...y FINISH You have finished installing your doors Secure hinge boards to wall innner framing with 10 3 screws as shown Make sure screws go into framing 4 Install OO flush under panels Secure to floor f...

Page 44: ...ails FA with 3 4 screws from inside of doors 4 3 Center trim WR over doors and secure with 5 2 finishing nails into framing Install door trim ACL and ACL as shown with 3 4 screws from inside of doors...

Page 45: ...grade caulk behind frame near edge before installing to seal window 3 4 1 9 cm Screws x8 Your transom windows are installed FINISH 3 4 1 9 cm x8 x2 BACK SIDE OF DOORS Center window on mark FRONT SIDE...

Page 46: ...nter OO in door opening OO x2 OO x2 3 4 1 9 cm 3 4 1 9 cm OFFSET 2 5 1 cm Screws Fig B IT IS IMPORTANT TO HOLD THESE DIMENSIONS 2 5 1 cm Screws x14 FINISH BEGIN 1 Center OO s vertically on the left an...

Page 47: ...open position with bolt end 3 8 down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B Your spring b...

Page 48: ...2 FINISH RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 3 8 Drill through DOOR HARDWARE DECORATIVE HINGES x1 3 4 1 9 cm x12 x4 x2 PARTS REQUIRED 1 1 2 3 8 cm Re drill hole with 3 8 drill Keep dril...

Page 49: ...back 71 1 2 corner trim is flush under gable panel Fig A and flush along the face of side wall panel Secure with 2 finishing nails spaced evenly FINISH Your corner trim is now installed 71 1 2 on eav...

Page 50: ...aulk behind vent flanges Your wall vents are now installed Secure with 1 2 screws x12 1 2 1 3 cm x2 WALL VENTS 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm Caulk 4 1 4 10 8 cm You can pl...

Page 51: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 52: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 53: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 54: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 55: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 56: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 57: ...Door Rail 19 32 TST 2 1 2 X 22 5 8 UT22100208000 2 FA Over Door Trim 19 32 TST 2 1 2 X 63 UT63000208000 1 WR Right Crossbuck 19 32 TST 2 1 2 X 59 20 L S RIGHT UT59000208120 1 ACR Left Crossbuck 19 32...

Page 58: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...

Reviews: