![background image](http://html1.mh-extra.com/html/backyard-products/heartland-midtown-8x10/heartland-midtown-8x10_assembly-manual_3358435008.webp)
6
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
DRIP EDGE ..................... 50 Feet
#15 ROOFING FELT
To cover 116 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 5 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM .............................2 Quarts
Use 100% acrylic latex exterior paint.
You must caulk completely around window frame to
validate your warranty. Use a paintable exterior rated caulk.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists
(shown below as shaded). Below is a list of additional materials (not included):
x2
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm) Treated Lumber
Cut to 2 x 4 x 117" (5,1 x 10,2 x 297,2 cm)
x8
3" (7,6 cm) hot-dipped galvanized nails
Optional 12" (30,5 cm) spacing
Standard 16" (40,5 cm) spacing
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
• If your shed came with a separate floor kit, then please use the instructions supplied with that kit to assemble your floor.
• See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your floor,
as this will vary depending on your specific site.
• If you choose to install your floor on a concrete slab, refer to page 7.
• If you choose to build your own wood floor foundation, refer to page 8.