![background image](http://html1.mh-extra.com/html/backyard-products/heartland-midtown-8x10/heartland-midtown-8x10_assembly-manual_3358435009.webp)
7
A
B
C
4"
(10,2 cm)
3-1/2"
(8,9 cm)
DOOR
CONCRETE FOUNDATION
If you choose to install your kit on a concrete slab refer to the diagram below.
• A treated 2 x 4 (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete.
Hint: Use treated lumber in your kit or purchase full length treated lumber.
• Use a high quality exterior grade caulk beneath all sill plates.
• Fasten 2 x 4 (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors
(fasteners not included)
.
• Check local code for concrete foundation requirements.
NOTES
Allow new concrete slabs to cure for at least seven (7) days.
Cut to 113" (287 cm)
Requires:
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm)
x2
MUST be treated lumber.
2 x 4 x 8' (5,1 x 10,2 x 243,8 cm)
x2
MUST be treated lumber.
Caulk
x1
Treated Sill Plate
Caulk between sill
plate and concrete.
A
B
C
Actual Floor Size
Building Size
96" (243,8 cm)
120" (304,8 cm)
96" x 120"' (243,8 x 304,8 cm)
8'x 10' (243,8 x 304,8 cm)
113" (287 cm)