background image

Hard Wall Aluminium Sukkah -

Assembly Instructions  

1. Your Sukkahmart Sukkah and / or Rain Roof
is intended for use in a protected garden or
yard. Do not install your Sukkah in an open area
which is exposed to high winds which may
blow your Sukkah over.

2. If you are installing a Sukkah in an open area,
we recommend that you use the Super Sukkah
ONLY.

SAFETY WARNING - 

Please read before use

1

3. Wherever you place your Sukkah, it is vital
that you anchor your Sukkah down so that it
cannot lift off the ground. If wind lifts the
Sukkah off the ground, the Sukkah may
collapse upon landing. This is especially
important when using a Sukkah Roof.

4. You can weigh your Sukkah down, by
placing sandbags or heavy objects on the
bottom horizontal beam, or, for a Hard-Walled
Sukkah on the anchoring brackets supplied.
The Hard-Walled Sukkah also comes with
adaptors which can be used to tie-down the
Sukkah, or to fix the Sukkah to your house.

Summary of Contents for Sukkah

Page 1: ...Please read before use 1 3 Wherever you place your Sukkah it is vital that you anchor your Sukkah down so that it cannot lift off the ground If wind lifts the Sukkah off the ground the Sukkah may coll...

Page 2: ...2 500cm Top Corner Support pink sticker 4 300cm Anchoring Bracket pink sticker Tie Down Wall Fixing Adapter 4 Basic Sukkah Kit 2x3 Contents Door Beams and Panels put these aside for your door Hinge B...

Page 3: ...put these aside for your door Hinge Beams 2 beams joined together with hinges 1 Handle Beam beam with handle and latch on 1 Hook Beam beam with hook for latch on 1 Door Crossbeams white sticker 3 Suk...

Page 4: ...turn the bolt The lock will lock the beam in place To build a 2x3 Sukkah Step 1 Start with the bottom and upright beams first NB Ensure that both sides of the hinges are facing outwards as in this pic...

Page 5: ...st row of panels into the slots Pic 2 2 slot upright Pic 1 Panel going in On a 2 meter wall use a 2 slot upright beam between the two panels NB Panels are not exactly square Make sure you insert the p...

Page 6: ...he red sticker and another 1 meter crossbeam Step 3 Place a crossbeam on top of the panel insert a second panel on top of the crossbeam and close the top off with a 1 or 2 meter crossbeam Leave a gap...

Page 7: ...2m x 3m ARIAL VIEW 3m x 4m ARIAL VIEW 5 0 c m 3m 2m Step 6 Place top supports ontop of your Sukkah for added strength Pink Stickers 7 5 0 c m 4m 1m 1m 1m Joiner 4 x 4 cm 1m 3m 2m 1m...

Page 8: ...Place a sandbag or heavy item ontop of foot Sandbag over a foot Use Rings to fix to wall or tie down Upright Pole Foot 8 Step 7 Use remaining supports to anchor your sukkah...

Reviews: