background image

Hard Wall Aluminium Sukkah - 3x3m

Assembly Instructions  

1. Your Sukkahmart Sukkah and / or Rain Roof 

is intended for use in a protected garden or 
yard. Do not install your Sukkah in an open 
area which is exposed to high winds which 
may blow your Sukkah over.

2. If you are installing a Sukkah in an open area, 

we  recommend  that  you  use  the  Super 
Sukkah ONLY.

SAFETY WARNING - 

Please read before use

1

3. Wherever you place your Sukkah, it is vital 

that you anchor your Sukkah down so that 
it cannot lift off the ground. If wind lifts the 
Sukkah  off  the  ground,  the  Sukkah  may 
collapse  upon  landing.  This  is  especially 
important when using a Sukkah Roof.

4.  You  can  weigh  your  Sukkah  down,  by 

placing sandbags or heavy objects on the 
bottom  horizontal  beam,  or,  for  a  Hard-
Walled Sukkah on the anchoring brackets 
supplied.  The  Hard-Walled  Sukkah  also 
comes with adaptors which can be used 
to  tie-down  the  Sukkah,  or  to  fix  the 
Sukkah to your house.

Summary of Contents for Hard Wall Aluminium 3x3m

Page 1: ...NG Please read before use 1 3 Wherever you place your Sukkah it is vital that you anchor your Sukkah down so that it cannot lift off the ground If wind lifts the Sukkah off the ground the Sukkah may c...

Page 2: ...1 Handle Beam beam with handle and latch on 1 Hook Beam beam with hook for latch on 1 Door Crossbeams white sticker 3 Under Door Support Bracket pink sticker 1 White Panel with red sticker top panel...

Page 3: ...hese aside for your door Hinge Beams 2 beams joined together with hinges 1 Handle Beam beam with handle and latch on 1 Hook Beam beam with hook for latch on 1 Door Crossbeams white sticker 3 Sukkah El...

Page 4: ...tool to turn the bolt The lock will lock the beam in place To build a 3x3m Sukkah Step 1 Start with the bottom and upright beams first NB Ensure that both sides of the hinges are facing outwards as in...

Page 5: ...st row of panels into the slots Pic 2 2 slot upright Pic 1 Panel going in On a 2 meter wall use a 2 slot upright beam between the two panels NB Panels are not exactly square Make sure you insert the p...

Page 6: ...he red sticker and another 1 meter crossbeam Step 3 Place a crossbeam on top of the panel insert a second panel on top of the crossbeam and close the top off with a 1 or 2 meter crossbeam Leave a gap...

Page 7: ...1m 3m x 3m ARIAL VIEW Step 6 Place top supports ontop of your Sukkah for added strength Pink Stickers 7 5 0 c m 3m 1m Joiner 4 x 4 cm 1m 3m 2m 1m...

Page 8: ...Place a sandbag or heavy item ontop of foot Sandbag over a foot Use Rings to fix to wall or tie down Upright Pole Foot 8 Step 7 Use remaining supports to anchor your sukkah...

Reviews: