Installation, Operation and Maintenance Manual
VCIOM-15345-EN Rev. 1
February 2022
9
Installation
Section 2: Installation
2.4.2
RPHD/RPHS-Series Actuators
2.4.2.1
Horizontal Pipeline Vertical Stem
The RPHD/RPHS series actuators mounting on a horizontal pipeline with a vertical
valve stem should be supported using the 4 lifting point (two on the cylinder and
two on the spring container). The weight of the actuator must be supported by
the proper lifting point, not the stabilization tab, see Figure 2.
Figure 2
!
CAUTION
Never lift the actuator with a valve attached. Always handle actuator/valve assemblies by
attaching lifting equipment to the valve only.
!
CAUTION
Please note that other mounting positions are available, in case of needing please contact
the factory.