E9
11. Fill hub cap half full of wheel bearing grease and install on hub.
12. Install wheel, tighten lug nuts to 265 foot pounds and remove jack and blocks.
Tread Width Adjustment
The tire tread width may be adjusted to accommodate a variety of row widths and cropping
programs. The adjustable axle may be adjusted to any position between 88 and 132 inches.
To adjust the tread width to a narrower or wider position:
1. Jack tire clear of ground and block axle. Make sure you don’t impede movement of the
axle stub weldment.
Vertical
Adjustment Bolts
Axle stop
Clamping Plate
DANGER:
!
DANGER:
!
Make axle adjustments only when tank is empty and the
sprayer is attached to an adequate towing vehicle that is
in park.
Before making any adjustments to the axle make sure
that the sprayer frame is adequately supported without
any weight on the tire or axle.
Summary of Contents for field-pro IV 1600
Page 10: ...A9 A B C D E G F P N 67657 A P N DEC HAZ01 A P N 67673 B Safety Sign Locations P N DEC HAZ08 A...
Page 13: ...A12...
Page 19: ...B6...
Page 29: ...C10 Raven 450 Wiring Diagram...
Page 47: ...D14...
Page 50: ...E3 50 Hours 12 Hours 2 places 12 Hours 2 places 12 Hours Grease Zerk Locations...
Page 59: ...E12...
Page 62: ...G1 PARTS LISTING Frame and Tank Assembly...
Page 67: ...G6...
Page 68: ...G7 Base Plumbing Details...
Page 70: ...G9 Pro 90 Boom...
Page 71: ...G10 Pro 90 Boom...
Page 75: ...G14...
Page 76: ...G15 Pro 90 Boom Hydraulic Schematic...
Page 78: ...G17 Pro 90 Boom Plumbing...
Page 80: ...G19...
Page 82: ...G21 Foam Guidance System...
Page 86: ...G25 1600 1850 Gallon Rinse System Assembly...
Page 90: ...G29 Deluxe Plumbing Plate with 5 Valve Stack Assembly...
Page 92: ...H1 Base Wiring Details...
Page 94: ...H3 Control Valve Wiring Details...
Page 96: ...H5 Light Wiring Details...