INITIAL PREPARATION
AND SETUP
Tractor Preparation and Hookup
1. Check and adjust tractor drawbar as shown so that it is located 16 to 22 inches above the
ground. Then adjust the drawbar to a stationary position so that the hitch pin is directly below the
center line of the PTO shaft.
2. Adjust sprayer hitch position, if necessary, to a setting that allows the trailer to tow in a level
position when hitched to the tractor. A total of four holes in the hitch mounting bracket permit the
choice of three different mounting positions.
3. Securely attach to towing unit. Connect sprayer to the tractor using a high strength, 1 1/4” -
1 1/2” hitch pin with a locking hairpin or hammer strap latch and attach safety chains. Install the
C1
Summary of Contents for field-pro IV 1600
Page 10: ...A9 A B C D E G F P N 67657 A P N DEC HAZ01 A P N 67673 B Safety Sign Locations P N DEC HAZ08 A...
Page 13: ...A12...
Page 19: ...B6...
Page 29: ...C10 Raven 450 Wiring Diagram...
Page 47: ...D14...
Page 50: ...E3 50 Hours 12 Hours 2 places 12 Hours 2 places 12 Hours Grease Zerk Locations...
Page 59: ...E12...
Page 62: ...G1 PARTS LISTING Frame and Tank Assembly...
Page 67: ...G6...
Page 68: ...G7 Base Plumbing Details...
Page 70: ...G9 Pro 90 Boom...
Page 71: ...G10 Pro 90 Boom...
Page 75: ...G14...
Page 76: ...G15 Pro 90 Boom Hydraulic Schematic...
Page 78: ...G17 Pro 90 Boom Plumbing...
Page 80: ...G19...
Page 82: ...G21 Foam Guidance System...
Page 86: ...G25 1600 1850 Gallon Rinse System Assembly...
Page 90: ...G29 Deluxe Plumbing Plate with 5 Valve Stack Assembly...
Page 92: ...H1 Base Wiring Details...
Page 94: ...H3 Control Valve Wiring Details...
Page 96: ...H5 Light Wiring Details...