Controller Installation
In most cases, the Field-Pro IV will come from the factory with a Raven 450 sprayer control
pre-installed. However, the Field-Pro IV can also be ordered with the base deluxe plumbing plate
and 5-valve stack assembly, which permits the owner to install any compatible control system
desired. Keep in mind that the deluxe ball valves require 12 volts at all times so the valves can
close when the control wires drop voltage. This is different than a solenoid-type valve that closes
with spring action.
To install a Raven 450 control on a unit that is not already equipped with the unit, refer to the
specific instructions that follow.
C8
5-valve stack assembly
with Raven controller.
Summary of Contents for field-pro IV 1600
Page 10: ...A9 A B C D E G F P N 67657 A P N DEC HAZ01 A P N 67673 B Safety Sign Locations P N DEC HAZ08 A...
Page 13: ...A12...
Page 19: ...B6...
Page 29: ...C10 Raven 450 Wiring Diagram...
Page 47: ...D14...
Page 50: ...E3 50 Hours 12 Hours 2 places 12 Hours 2 places 12 Hours Grease Zerk Locations...
Page 59: ...E12...
Page 62: ...G1 PARTS LISTING Frame and Tank Assembly...
Page 67: ...G6...
Page 68: ...G7 Base Plumbing Details...
Page 70: ...G9 Pro 90 Boom...
Page 71: ...G10 Pro 90 Boom...
Page 75: ...G14...
Page 76: ...G15 Pro 90 Boom Hydraulic Schematic...
Page 78: ...G17 Pro 90 Boom Plumbing...
Page 80: ...G19...
Page 82: ...G21 Foam Guidance System...
Page 86: ...G25 1600 1850 Gallon Rinse System Assembly...
Page 90: ...G29 Deluxe Plumbing Plate with 5 Valve Stack Assembly...
Page 92: ...H1 Base Wiring Details...
Page 94: ...H3 Control Valve Wiring Details...
Page 96: ...H5 Light Wiring Details...