Method of Installation
7. Once all the required CT’s have been
connected to the RJ12 adaptor, plug the RJ12
into the correct CT point on the Eniscope.
8. You can now turn the power on to the
distribution panel.
Notes:
If you need to extend the CT lead
this can be done up to 10 meters using a
600V 1mm2 18 AWG, single core wire to
VW-1 fame rating. Route CT cables away
from mains voltage current carrying
cables.
You have now completed the Electricity
monitoring section. Please review the
commissioning section to ensure the Real-time
display and Analytics is receiving the recorded
data.
19
[ E N S C O P E H Y B R I D M A N U A L ]