1
Installation Manual
T700/T2000
For Phoenix Gen 4 units built after 6/26/2017
2390 Blackhawk Road ● Rockford, IL 61109 ●
● 1-866-204-8570
The information contained herein is proprietary to Bergstrom Inc and/or its subsidiaries shall
not be reproduced, copied, or disclosed in whole or in part, or used for manufacture or any
other purpose, without prior written permission of Bergstrom Inc. The only controlled version
is that viewed electronically on the designated Bergstrom intranet site.
Summary of Contents for NITE Phoenix T2000
Page 8: ...8 1 6 Before You Start EPA ...
Page 9: ...9 1 7 Cardboard Template Layout Unit Exploded View ...
Page 24: ...24 Section 2 Electrical Installation ...
Page 42: ...42 2 18 Electrical Installation ...
Page 46: ...46 Section 3 ESPAR Fuel Operated Heater Installation ...
Page 60: ...60 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams ...
Page 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams ...
Page 62: ...62 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams ...
Page 63: ...63 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams ...
Page 64: ...64 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams ...
Page 65: ...65 Section 5 Operating Instructions ...
Page 69: ...69 Section 6 Battery Management System BMS Installation ...
Page 70: ...70 6 1 Bergstrom NITE System BMS 100 Installation Battery Management ...
Page 71: ...71 6 2 Battery Management ...
Page 72: ...72 6 3 Battery Management ...