
Translated user manual
EasyKit
page 29 of 45
and must not be loose. The top side of the pipe should lie at least 15 cm on the concrete
path. At the pipe ends (in front of the wall) there should be an end-stop welded on that is at
least 5 cm high, check at the change of each season whether the stops are still functioning
properly. The ground under the pipe rail system should be dry, flat and hard. Soft or damp
spots should be repaired and surface indentations permanently repaired.
8.4 Carbon brush maintenance
Figure 5a: Carbon brushes
Figure 5b: Carbon brushes inspection
Please contact your dealer when the carbon brushes are shorter than 1 cm and require to be
replaced.