22
STEP ELEVEN
( Installing Overhead MICRO SWITCH. )
1. Install the overhead Micro Switch as shown
below. Be sure to keep wire clear of moving
parts. WIRING MUST BE PERFORMED BY A
CERTIFIED ELECTRICIAN. Fig 23 & 24.
STEP TWELVE
( Power Unit Installation and Start-Up. )
1. The standard power unit for your lift is 220 volt,
60HZ, single phase. All wiring must be performed
by a certified electrician only. SEE WIRING
INSTRUCTIONS AFFIXED TO MOTOR FOR
PROPER WIRING INSTRUCTIONS.
Fig 24
Fig 23
DANGER!
DO NOT PERFORM ANY MAINTENENCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENENCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
I
MPORTANT NOTE:
CAUTION Never operate the motor on line voltage
less than 208V. Motor damage may occur which is not covered under warranty.
Have a certified electrician run appropriate power supply to motor.
Size wire for 25amp circuit. See Motor Operating Data Table.
IMPORTANT: Use separate circuit for each power unit.
Protect each circuit with time delay fuse or circuit
breaker. For single phase 208-230V, use 25 amp fuse.
Three phase 208-240V, use 25 amp fuse. For three
phase 400V and above, use 15 amp fuse. All wiring must comply with NECK and all local electrical codes.