15
STEP SEVEN
( Mounting The POWER UNIT )
1. Attach the power unit to the POWERSIDE
COLUMN using four M8 hex bolts and nuts
supplied.
Fill the reservoir with 10 WT.
HYDRAULIC OIL OR DEXRON TYPE III ATF,
approximately four gallons
.
Make sure the fun-
nel used to fill the power unit is clean.
2. Remove plug from power unit and install the
90* fitting w/ O-ring into the power port on the
power unit. (Fig 10 )
3. The standard power unit for your lift is 220
volt, 60HZ, single phase. All wiring must be per-
formed by a certified electrician only. SEE
WIRING INSTRUCTIONS AFFIXED TO
MOTOR FOR PROPER WIRING INSTRUC-
TIONS
"
DO NOT run power unit with no oil. Damage
to pump can occur.
"
The power unit must be kept dry. Damage to
power unit caused by water or other liquids
such as detergents, acid etc., is not covered
under warranty.
Operate lift only between temperatures of 41 °-
104° F.
"
Improper electrical hook-up can damage motor
and will not be covered under warranty.
"
Motor can not run on 50HZ without a physi-
cal change in motor.
"
Use a separate breaker for each power unit.
"
Protect each circuit with time delay fuse or
circuit breaker.
“
For 208-230 volt, single phase, use a 25 amp fuse.
“
For 208-230 volt, three phase, use a 20 amp fuse.
“
For 380-440 volt, three phase, use a 15 amp fuse.
IMPORTANT NOTE:
When installing hydraulic fittings and hoses it
is not necessary to use Teflon tape or other
sealant.
Teflon tape and other sealing compounds can
contaminate the system and cause
malfunctioning of lift.
ALL WIRING MUST BE PERFORMED BY A
CERTIFIED ELECTRICIAN
DANGER!
DO NOT PERFORM ANY MAINTENENCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENENCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.