2. With the carriages in equal position from the
floor, route the equalizer cables. If you have
already routed them in the post as stated in
step 3. Remove the pulley and route the cable
around the pulley and reinstall it.
3.Take the cable across the top trough,
remove the pulley, route the cable around the
pulley and reinstall it.
4. Insert the threaded end of the cable
through the hole on top of the carriage put on
the equalizer cable nylock nut.
5. Route the other cable the same way.
20
Fig 20
Fig 21
Fig 22
WARNING!
WHEN THE CABLE ADJUSTING NUTS BOTTOM OUT ON THE THREADED END OF THE CABLE
CONNECTOR AND THERE IS STILL SLACK IN THE CABLES, THE CABLES HAVE STRETCHED BEYOND THE
SAFE USEFUL LENGTH AND NEED TO BE REPLACED WITH FACTORY APPROVED CABLE ASSEMBLIES. DO
NOT PLACE WASHERS, SPACERS OR OTHER DEVICES TO “SHORTEN” THE
EFFECTIVE CABLE LENGTH AS DAMAGE TO THE LIFT OR INJURY TO PERSONS MAY OCCUR.
Make sure that the safety locks on each column are fully engaged before
attempting to route equalizer cables and/or hoses.
Carriages must be equal height from the floor before proceeding.