17
2. From the offside column insert the
non looped end of the safety cable
through the hole located to the right of
the offside safety weldment. (Fig 13)
3.Route the cable under the pulley
and take it up to the Top Trough.
(Fig 14)
4. Route the cable through the pulley
and across the lift.
(Fig 15 & 16)
ENSURE THAT BOTH THE
POWERSIDE AND OFF-
SIDE SAFETIES ENGAGE
PROPERLY PRIOR TO
OPERATING THE LIFT
Fig 13
Fig 14