![Beckhoff EL3773 Documentation Download Page 108](http://html1.mh-extra.com/html/beckhoff/el3773/el3773_documentation_2719601108.webp)
Commissioning
EL3773
108
Version: 2.5
Fig. 116: Representation of a created PLC array variable („aUI_Samples“) to link with oversampling PDOs of
EL3773
Step 2b: Creation of a PLC variable via a free task
When a POU is not needed onto the particular system, a referenced variable could be applied via a free task
also. If a free task is not existing still yet, it can be created by a right-click to “Task” of the project within
SYSTEM with “Add New Item…”.
Fig. 117: Insertion of a free task
Summary of Contents for EL3773
Page 1: ...Documentation EL3773 Power Monitoring Oversampling Terminal 2 5 2018 03 13 Version Date...
Page 2: ......
Page 6: ...Table of contents EL3773 6 Version 2 5...
Page 39: ...Mounting and wiring EL3773 39 Version 2 5 Fig 29 Other installation positions...
Page 41: ...Mounting and wiring EL3773 41 Version 2 5 Fig 31 Block diagram...
Page 47: ...Commissioning EL3773 47 Version 2 5 Fig 38 Incorrect driver settings for the Ethernet port...
Page 147: ...Commissioning EL3773 147 Version 2 5 Fig 168 Confirming program start...