21 October 2011
Ford 6.7L 2011-2012 Positive Air Shutoff
37
BD ENGINE BRAKE, INC.
Plant Address: A10-33733 King Rd, Abbotsford, BC, Canada V2S 7M9
US Shipping Address: 88-446 Harrison St, Sumas, WA 98295 US Mailing Address: PO Box 231, Sumas, WA 98295
Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com
them step on the accelerator with the
vehicle in park. Raise the engine RPM
to MAXIMUM engine RPM.
11. Release the SET RPM button.
Upon releasing the button the unit will
store the RPM + 25%. So for this
example
the
unit
has
stored
MAXIMUM engine RPM + 25%.
Set
Button
PRESS &
HOLD
RPM Set
RELEASE TO
STORE RPM
RPM Set
12. You can now put the electronic
enclosure back together and secure it
to the fuse box.
13. With the engine running you will need
to test to make sure the manual
activation
switch
is
functioning
correctly.
14. With the engine running, lift the
activation switch and the engine
should die.
15. Reset the valve and you are now
complete.
If valve does not activate check the
wiring.
If the valve activates and the engine
does not die ensure nothing has
contacted the linkage.
You are now complete the installation, please be sure to complete the test
once a year to make sure the unit is functioning correctly.