21 October 2011
Ford 6.7L 2011-2012 Positive Air Shutoff
8
BD ENGINE BRAKE, INC.
Plant Address: A10-33733 King Rd, Abbotsford, BC, Canada V2S 7M9
US Shipping Address: 88-446 Harrison St, Sumas, WA 98295 US Mailing Address: PO Box 231, Sumas, WA 98295
Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com
6. With the sticker in place use
a center punch and then use
a Ø
1/8” drill bit and drill a
hole in the center of the
holes marked “For 3Ø”.
There will be two holes and they
should be perfectly 180° inline
with each other through the pipe.
DO NOT DRILL COMPLETELY
THROUGH THE PIPE AND
OUT THE OTHER END. YOU
WILL NEED TO DRILL ONE
SIDE THEN ROTATE, AND
THEN DRILL THE OTHER
SIDE.
7. Once the pilot holes are
drilled you will need to drill
an Ø11/32” hole through the
pilot holes.
You can now remove the sticker.
You must deburr the inside of
the drilled holes.
Now drill the pilot
holes using 11/32
drill bit.
Drill two 1/8” holes;
they should be 180°
apart in line.