21 October 2011
Ford 6.7L 2011-2012 Positive Air Shutoff
22
BD ENGINE BRAKE, INC.
Plant Address: A10-33733 King Rd, Abbotsford, BC, Canada V2S 7M9
US Shipping Address: 88-446 Harrison St, Sumas, WA 98295 US Mailing Address: PO Box 231, Sumas, WA 98295
Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com
INSTA
LL
ATION with
out OVE
R SPEED
ELEC
TRONI
CS
8. Once the holes are drilled,
install the ring bead around
the pipe. Lock each end of
the ring bead into each hole.
You can use needle nose
pliers to tweak or adjust the
ring fit slightly.
Be careful not to bend the ring
bead to much as you will
weaken it.
Note the ring bead does not
have to be perfectly tight or
snug around the pipe, as we
will be installing a silicone boot
over top of it.
With the ring bead in place,
you should not be able to pull
the ring bead off axially from
the tube.
9. Once the bead rings are
installed, connect the pipes to
the valve assembly ensuring
the arrow on the valve points
towards
the
pipe
that
connects to the turbo.
Secure the boot with the
provided
3.5”
clamp
(1407030). Note that there
should be about
3/4”-1” of
silicone material after the bead
ring.
Note: leave clamps loose to
allow for movement.