21 October 2011
Ford 6.7L 2011-2012 Positive Air Shutoff
20
BD ENGINE BRAKE, INC.
Plant Address: A10-33733 King Rd, Abbotsford, BC, Canada V2S 7M9
US Shipping Address: 88-446 Harrison St, Sumas, WA 98295 US Mailing Address: PO Box 231, Sumas, WA 98295
Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com
INSTA
LL
ATION with
out OVE
R SPEED
ELEC
TRONI
CS
When both pipes are cut they should look like this.
WATER TO AIR PIPE TURBO PIPE
5. Remove backing from drill Jig
sticker and wrap around pipe.
The edge of the sticker should
line up with the edge of the
pipe.
For the 3” pipe the sticker
should wrap perfectly around
the pipe, the start of the
sticker should meet the end of
the sticker.
NOTE
: Refer to the Bead Ring
and
Drill
Jig
Installation
section on page 29 in this
manual if you require more
information.
Sticker edge and pipe
edge inline