21 October 2011
Ford 6.7L 2011-2012 Positive Air Shutoff
9
BD ENGINE BRAKE, INC.
Plant Address: A10-33733 King Rd, Abbotsford, BC, Canada V2S 7M9
US Shipping Address: 88-446 Harrison St, Sumas, WA 98295 US Mailing Address: PO Box 231, Sumas, WA 98295
Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com
8. Once the holes are drilled,
install the ring bead around
the pipe. Lock each end of
the ring bead into each hole.
You can use needle nose pliers
to tweak or adjust the ring fit
slightly.
Be careful not to bend the ring
bead to much as you will
weaken it.
Note the ring bead does not
have to be perfectly tight or
snug around the pipe, as we will
be installing a silicone boot over
top of it.
With the ring bead in place, you
should not be able to pull the
ring bead off axially from the
tube.