21 October 2011
Ford 6.7L 2011-2012 Positive Air Shutoff
5
BD Engine Brake Inc.
Plant Address: 33541 MacLure Rd. Abbotsford, BC, Canada V2S 7W2
U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295
Phone: 604-853-6096 | Fax: 604-853-8749 | Internet: www.bd-power.com
MAINTENANCE
No maintenance is needed other then check to make sure the valve is acting correctly.
Please see the testing section later in the manual for the correct procedure.
INSTALLATION with OVER SPEED ELECTRONICS (1036703)
VEHICLE
SHOULD
BE
SAFELY
SECURED
BEFORE
INSTALLATION.
1.
Block the wheels of the vehicle to prevent the vehicle from rolling.
Open the hood.
2. Remove the charge air cooler
pipe using a flat screwdriver to
release the spring clips on both
sides of the turbo intake, and a
7/16” socket and ratchet to
loosen both T clamps to release
the pipe from the water to air
cooler.
NOTE:
Keep all spring clamps
as you will be reusing them.