23
7.0
Arranging the Coals - Page 23
7.1 Identification
It is Important that all the firebed components are used
and arranged as shown In order to achieve the desired
flame picture. Ensure all firebed components are
present and Identified prior to Installation.
1. Remove the coals, and front and rear coal mouldings
from their packaging and place them on a newspaper or
similar to prevent soiling furnishings.
CAUTION: The coals are extremely fragile and must be
handled accordingly. To avoid soiling ones hands,
gloves should be worn and any inhalation of the dust
should be avoided. Keep the coals away from children at
all times. Never use coals other than those supplied or
Genuine Baxi Spare Parts. Never put additional coals on
the fire. Please read Section 1.2 Important Information
2. The side and back brick effect insulation panels can be
reversed to offer a plain effect for the customer. To reverse
this brick effect remove the left and right hand black sheet
metal retaining pieces. Carefully remove the three insulation
panels and reassemble with the plain effect on display. Refit
the retaining panels taking care not to damage the paint and
insulation panels.
Summary of Contents for Belmont 2
Page 7: ...7 ...
Page 11: ...11 4 0 Electrical Page 10 4 2 Schematic Wiring Diagram ...