
PD-TaD 80
Preparing a measurement
822-188-3
51 / 74
7.1
Switching on the system and starting the BAUR software
1. Switch on the system.
Further information: User manual for the cable test van or the VLF HV generator
The system status changes to the
Ready for operation
operating state.
2. The PD measuring unit of the PD-TaD 80 will be switched on automatically when it is
supplied with voltage. Wait until all the LEDs on the PD-TaD 80 display the ready for
operation status.
PWR
– green
PD
– orange
3. Start the BAUR software 4.
The Dashboard opens.
For information on performing the diagnostics methods, refer to the
user manuals for the BAUR software 4.
7.2
Selecting a cable route and entering cable data
For information on selecting or entering cable data, refer to the
user manual for the BAUR software 4.
7
P
REPARING A MEASUREME NT