Installation
Operation manual
b maXX
BM4100 (NWR)
Document no.: 5.04052.09
75
7
Figure 33:
Connections of the controller part
UH
1
: green: Programmable LED
yellow: Programmable LED
UH
2
: green: Programmable LED
yellow: Programmable LED
H
1
: green: Supply
yellow: Feedback
H
2
: green: Enable
yellow: Power ON
H
3
: red: Current limit reached
H
4
: red: Error
X4: reserved
6
: DTR, DSR
7
: RTS
8
: CTS
9
: reserved
1
: reserved
2
: TxD RS232
3
: RxD RS232
4
: DTR, DSR
5
:
Ground RS232
H5 display:
7 segment display
Standard operation Display drive status
Error condition: Display error number
X2:
Connection for
Baumüller memory module PSI ***
X3-
1
: BB on (no contact) (SELV/PELV)*
X3-
2
: BB-On (middle reversing switch)
(SELV/PELV)
*
X3-
3
: Reference potential for 4 and 5
(SELV/PELV)
*
X3-
4
: Error reset (SELV/PELV)*
X3-
5
: Pulse enable (SELV/PELV)*
X3-
6
: BB-ON (NC contact) (SELV/PELV)*
Summary of Contents for b maXX 4100 Series
Page 143: ......