EMD-CM and RM User’s Manual
3.0 Approvals
The devices are designed to meet state-of-the-art safety requirements in accordance with sound
engineering practice. They have been tested and le the factory in a condi on in which they are
safe to operate.
The devices comply with the applicable standards and regulations in accordance with EN 61010-1
"Safety requirements for electrical equipment for measurement, control and laboratory use" and
with the EMC requirements of IEC/EN 61326.
The measuring system described in this Opera ng Manual is therefore in conformity with the
statutory requirements of the EC Directives. Bass Instruments confirms successful tes ng of the
device by affixing to it the CE mark.
4.0 Installa on
4.1 Transporta on and Handling
Do not li the detector from the Converter housing,
the junc on box or the connec ng cable. Use li ing
lugs for larger sizes is recommended. Very large meter
sizes are packed and crated with the meter laying on its
side for shipping safety and stability reasons. In order to
li the meter in ver cal position, it's recommended to use
a sling rigged method as shown below.
Warning: NEVER
introduce the forkli , chains,
wire slings or any other sharp object inside the flow tube
for li ing or handling purpose. This could permanently
damage the isolating liner and could render the meter
inoperable.
26