Manual MODUL 200
®
- 5 -
CONTEC
Maschinenbau
& Entwicklungstechnik GmbH
© CONTEC
®
2016
Hauptstrasse 146, 57518 Alsdorf (Sieg) / Germany
Tel: +49 (0) 2741 9344-0 Fax: +49 (0) 2741 9344-29
phases, 230 V, 60 Hz connection. When operating a double unit (MODUL 200
®
+ MODUL
200
®
EU) a 63 A, 3 phases, 60 Hz connection is required.
Check the floor for screws, nuts, or stones etc., and sweep the floor if necessary, with a brush
or vacuum system. Small obstacles like joints pose no problems for MODUL 200
®
. If there
are bigger undulations or similar check if it is possible for the machine to drive over them
before the turbine is switched on.
ATTENTION !
In the case of severe undulations or difficult joints on the floor it is possible for the magnetic
frame of the machine to rise too far above the floor. The sealing of the shotblaster becomes
ineffective and shot escapes from the machine at high speed. This can cause injury to
persons and equipment. Before operating always check the condition of the floor to prevent
this from occurring.
Lift the control panel and remove the shot compartment lid (Appendix diagram No. 159 -
161). Make sure that the shot valve lever (Appendix diagram No. 165) is on “close” position
and fill the shot compartment with shot until level with the sieve. Do not fill above the sieve
level as suction from the dust collector will suck it away with the dust.
ATTENTION!
Only place new or clean shot in the shot compartment.
Clean the sieve (Appendix diagram No. 157) in the shot compartment if it is blocked.
Take the clutch pin (Appendix diagram No. 209) out of the drill in the rear side of the
machine and put it into the holes of the drive axle (Appendix diagram No. 213). Take the
lifting bar and put the machine in the lower position.
Check the distance of the magnetic frame to the floor. The basic rule is the closer to the
floor the better. Unfortunately, floors are never ideal and mostly uneven. The distance must
be adapted to the floor but should never be more than 10 mm.
Switch the dust collector on.
Pull out the emergency STOP button (Appendix diagram No. 241) and press the START
button (Appendix diagram No. 35). on the control panel. If the indicator light of the button
does not stay on when you release your finger, then the motor wants to start in the wrong
direction. In this case two phases of the power supply must be swapped with each other.
Press the lever (Appendix diagram No. 237) of the drive unit switch and check the direction
and the speed. With the direction forward / reverse switch (Appendix diagram No. 33) it is
possible to change the direction. Only blast in the direction in which the operator has to walk
backwards. The speed is regulated by the speed regulator (Appendix diagram No. 27) on the
lower right end of the control panel. Drive the machine to the place where blasting should
begin.
Now switch the star delta switch (Appendix diagram No. 31) of the turbine motor from 0 to
star (Y) position. Make sure, that the blast wheel is rotating in the correct direction. The right
Summary of Contents for CONTEC MODUL 200
Page 1: ...MODUL 200 Mobile Shotblaster Instruction manual...
Page 24: ......