Maintenance
71
03/2016
CFPP Process Analyzer CFPP-4.2
Check the protective devices according to the following list. The checks of the protective
devices can be carried out while the analyzer is operating.
If any protective devices are missing, damaged or unusable, switch off the
analyzer immediately. Do not switch the analyzer back on before all protective
devices are again operating correctly.
Protective device
Required state
Label for key switch (2)
present, easily readable
Key switch (3)
in position “On” according to label (2)
Warning labels (1, 11, 14,
15, 18, 20-23)
present, easily readable
Control box (4)
undamaged, also visible outer components (e.g.
touchscreen)
no open bore holes or mounting cut-outs
door (12) is closed tightly and locked with both locks (10)
Measuring cell housing (17)
with rinsing tube
undamaged, also visible outer components
no open bore holes or mounting cut-outs
cover (19) is closed tightly and fastened with four
locks (16)
Power supply box (7)
undamaged
no open bore holes
door is locked (double-bit key)
Signal junction box (5)
undamaged
no open bore holes
cover is closed tightly and fastened with all fastening
screws
Housing of
Chiller for Liquids (9)
undamaged
no open bore holes or mounting cut-outs (except
ventilation holes)
all covers (8, 9 and 13) are closed tightly
Spare warning labels are available from BARTEC BENKE.
Summary of Contents for CFPP-4.2
Page 1: ...CFPP Process Analyzer CFPP 4 2 Operating Instructions 395778MDHEN A 03 2016 ...
Page 6: ...IV Contents CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 7: ...General 5 03 2016 CFPP Process Analyzer CFPP 4 2 1 General ...
Page 9: ...Safety 7 03 2016 CFPP Process Analyzer CFPP 4 2 2 Safety ...
Page 25: ...Introduction 23 03 2016 CFPP Process Analyzer CFPP 4 2 3 Introduction ...
Page 28: ...26 Introduction CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 29: ...Technical Data 27 03 2016 CFPP Process Analyzer CFPP 4 2 4 Technical Data ...
Page 33: ...Analyzer Description 31 03 2016 CFPP Process Analyzer CFPP 4 2 5 Analyzer Description ...
Page 46: ...44 Transport Packaging and Storage CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 55: ...Initial Operation 53 03 2016 CFPP Process Analyzer CFPP 4 2 8 Initial Operation ...
Page 64: ...62 Initial Operation CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 65: ...Operation 63 03 2016 CFPP Process Analyzer CFPP 4 2 9 Operation ...
Page 69: ...Maintenance 67 03 2016 CFPP Process Analyzer CFPP 4 2 10 Maintenance ...
Page 102: ...100 Maintenance CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 103: ...Troubleshooting 101 03 2016 CFPP Process Analyzer CFPP 4 2 11 Troubleshooting ...
Page 107: ...Troubleshooting 105 03 2016 CFPP Process Analyzer CFPP 4 2 ...