32
Analyzer Description
CFPP Process Analyzer CFPP-4.2 03/2016
5.1
Overview and Operating Elements
The following illustration gives you an overview of the analyzer:
1
2
3
4
5
7
8
9
11
10
12
18
14
15
16
17
13
6
19
Fig. 5.1: Overview
1 Vent connection (waste gas outlet)
2 Measuring unit enclosure
3 Transport eye
4 Touchscreen
5 Pen
6 Key switch
7 Overpressure control display
8 Control box (Ex p)
9 Type plate
10 Signal junction box (Ex e)
11 Power supply box (Ex e)
12 Drain connection (waste liquid
outlet)
13 Chiller for Liquids
14 Frame
15 Measuring cell housing (Ex p)
16 Measuring cell
17 Vacuum tank
18 Instrument air connection
19 Product inlet
The measurement takes place inside the measuring cell (16). The Chiller for Liquids (13)
combined with a heat exchanger and peltier elements in the measuring cell housing (15)
cool the sample. The measuring cell housing is pressurized together with the control box
(8). The control box contains the analyzer control unit and the control unit for the cooling
system.
Summary of Contents for CFPP-4.2
Page 1: ...CFPP Process Analyzer CFPP 4 2 Operating Instructions 395778MDHEN A 03 2016 ...
Page 6: ...IV Contents CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 7: ...General 5 03 2016 CFPP Process Analyzer CFPP 4 2 1 General ...
Page 9: ...Safety 7 03 2016 CFPP Process Analyzer CFPP 4 2 2 Safety ...
Page 25: ...Introduction 23 03 2016 CFPP Process Analyzer CFPP 4 2 3 Introduction ...
Page 28: ...26 Introduction CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 29: ...Technical Data 27 03 2016 CFPP Process Analyzer CFPP 4 2 4 Technical Data ...
Page 33: ...Analyzer Description 31 03 2016 CFPP Process Analyzer CFPP 4 2 5 Analyzer Description ...
Page 46: ...44 Transport Packaging and Storage CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 55: ...Initial Operation 53 03 2016 CFPP Process Analyzer CFPP 4 2 8 Initial Operation ...
Page 64: ...62 Initial Operation CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 65: ...Operation 63 03 2016 CFPP Process Analyzer CFPP 4 2 9 Operation ...
Page 69: ...Maintenance 67 03 2016 CFPP Process Analyzer CFPP 4 2 10 Maintenance ...
Page 102: ...100 Maintenance CFPP Process Analyzer CFPP 4 2 03 2016 ...
Page 103: ...Troubleshooting 101 03 2016 CFPP Process Analyzer CFPP 4 2 11 Troubleshooting ...
Page 107: ...Troubleshooting 105 03 2016 CFPP Process Analyzer CFPP 4 2 ...