5. Setup process of the X-series display
Image 5-7
2. The second stage is the installation of the
fi
rst row of stackers. See procedure "Installing X-series stacker", page 44.
The following illustration shows the recommended stacker con
fi
gurations for different display heights:
X1.x
X2
X4
Image 5-8
3. The next stage in the process is the installation of the
fi
rst rows of X-series tiles upon the truss/
fl
oor beams. See detailed pro-
cedures "Installing X-series tiles with standard connection pieces", page 46 and "Installing X-series tiles with advanced (rental)
connection pieces", page 47.
Note:
The bottom row of the X-series tiles has to be secured to the X-series truss/
fl
oor beam. For a base stand, always use
bolt/nut
fi
xations to attach the connection pieces to the truss/
fl
oor beam, instead of the pins that are used in a truss setup.
36
R5906024 X-SERIES 15/03/2016
Summary of Contents for X Series
Page 1: ...X series Installation manual second generation R5906024 01 15 03 2016 ...
Page 4: ......
Page 6: ...Table of contents 2 R5906024 X SERIES 15 03 2016 ...
Page 49: ...6 Basic Set up procedures Image 6 9 R5906024 X SERIES 15 03 2016 45 ...
Page 52: ...6 Basic Set up procedures 48 R5906024 X SERIES 15 03 2016 ...
Page 64: ...A Dimensions 60 R5906024 X SERIES 15 03 2016 ...
Page 72: ...B Specifications 68 R5906024 X SERIES 15 03 2016 ...
Page 76: ...C Order info 72 R5906024 X SERIES 15 03 2016 ...
Page 82: ...D Environmental information 78 R5906024 X SERIES 15 03 2016 ...
Page 84: ...Index X X series tile 16 80 R5906024 X SERIES 15 03 2016 ...