
47
R5914712 /00
SP2K-C
Image 4–13
4.
Guide the AC power cord (reference 2) through the cable gland (reference 3). Connect the wires
(references 4 and 5) to the 3–terminal strip (reference 6) as illustrated. Use a torque screwdriver to fasten
the screws of the 3-terminal strip with a torque of
1.7Nm
(1.25 lbf*ft).
Warning:
Always connect the PE wire (reference 4) first, then the other wires.
3
2
4
6
5
Image 4–14
2
UPS Power cord
3
Cable gland
4
PE wire
5
Other power wires
6
3–terminal strip
Tip:
Check for good fixation by pulling on each wire.
5.
Secure the AC power cord by fastening the cable gland (reference 3). Use a 24 mm open-end wrench.
6.
Place the net input cover back and seal it. Tighten the two screws (reference 1), using a T20 Torx
screwdriver.
Summary of Contents for SP2K-C
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP2K C...
Page 4: ......
Page 8: ...R5914712 00 SP2K C 8...
Page 48: ...R5914712 00 SP2K C 48 Physical installation projector...
Page 62: ...R5914712 00 SP2K C 62 Lenses Lens holder...
Page 70: ...R5914712 00 SP2K C 70 ICMP X...
Page 90: ...R5914712 00 SP2K C 90 ICMP X...
Page 98: ...R5914712 00 SP2K C 98 Projector Power Cycle...
Page 104: ...R5914712 00 SP2K C 104 Connectivity...
Page 107: ...107 R5914712 00 SP2K C Image 10 3 Sealed top cover remove Convergence...
Page 109: ...109 R5914712 00 SP2K C 1 1 Image 10 6 Sealed cover fixation Convergence...
Page 116: ...R5914712 00 SP2K C 116 Convergence...
Page 132: ...R5914712 00 SP2K C 132 Image 12 13 Tightening the screws of the side cover Projector covers...
Page 140: ...R5914712 00 SP2K C 140 Dimensions...
Page 146: ...R5914712 00 SP2K C 146 Restriction Zone clarification and use cases...
Page 150: ...R5914712 00 SP2K C 150 List of tools...
Page 154: ...R5914712 00 SP2K C 154 Index...
Page 155: ......