25
R5914712 /00
SP2K-C
Main Power requirements
Depending on the available power circuit, all SP2K-C projectors can operate from a single-phase power net or
three-phase power net.
Power system
Power requirements
three-phase power net
•
200-240V/346-415V, 3W+N+PE, 9A, 50/60Hz (Y)
•
200-240V, 3W+PE, 11A, 50/60Hz (Δ)
single-phase power net
200-240 VAC, L1+N+PE, 14A, 50/60Hz
The projector must be switched internally between a star connection (Y), a delta connection (Δ) or a mono-
phase connection or vice versa. See
“Connecting the projector with the power net”, page 44
The power cord required to connect the projector with the power net is not delivered with the projector. It is the
responsibility of the customer to provide the correct type of power cord. The cross-sectional area of the
conductors in the power supply cord shall not be less than 4 mm
2
(10 AWG).
In single-phase operation, the power cord must be rated for
minimum 300 V
.
In three-phase operation, the power cord must be rated for
minimum 300 V
in case of a 3W+PE (208V) power
system, and
minimum 500 V
in case of a 3W+N+PE (230/400 V) power system. For a 3W+PE system, 208 V
is measured between the lines. For a 3W +N +PE system, 400 V is measured between the lines, 230 V is
measured between the lines and the neutral.
To protect operating personnel, the National Electrical Manufacturers Association (NEMA) recommends that
the instrument panel and cabinet be grounded. In no event shall this projector be operated without an
adequate cabinet ground connection.
The AC supply must be installed by a qualified electrician in conformance to local codes. Hardware, wire sizes
and conduit types must comply with local codes.
A readily accessible disconnect device shall be incorporated externally to the equipment for removal of the
power to the equipment mains terminals.
The building installation must be provided with a circuit breaker of max. 40 A to protect the complete unit.
WARNING:
Disconnect the power to the unit mains terminals for removal of all power from the unit.
UPS requirements
The Uninterruptible Power Supply (UPS), also known as a Continuous Power Supply (CPS), must have an
output voltage of 200-240 V at 50/60 Hz and must be capable of delivering an output current of 5 A. This UPS
provides only power for the electronics and not for the light source.
The connection between the UPS unit and the UPS inlet of the projector must be done with a certified AC
power supply cord of minimum 1,50 mm² or 14 AWG and minimum 300 V.
The SP2K-C does not have a built in UPS unit.
Projector weight
Do not underestimate the weight of the SP2K-C projector. The projector weight ±103 kg (±227 lbs) without
lens. Ensure that the pedestal on which the projector is installed is capable of supporting the complete load of
the system. Minimum 4 people are needed to carry the projector.
CAUTION:
Do not stack projectors, even with external frame.
Summary of Contents for SP2K-C
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP2K C...
Page 4: ......
Page 8: ...R5914712 00 SP2K C 8...
Page 48: ...R5914712 00 SP2K C 48 Physical installation projector...
Page 62: ...R5914712 00 SP2K C 62 Lenses Lens holder...
Page 70: ...R5914712 00 SP2K C 70 ICMP X...
Page 90: ...R5914712 00 SP2K C 90 ICMP X...
Page 98: ...R5914712 00 SP2K C 98 Projector Power Cycle...
Page 104: ...R5914712 00 SP2K C 104 Connectivity...
Page 107: ...107 R5914712 00 SP2K C Image 10 3 Sealed top cover remove Convergence...
Page 109: ...109 R5914712 00 SP2K C 1 1 Image 10 6 Sealed cover fixation Convergence...
Page 116: ...R5914712 00 SP2K C 116 Convergence...
Page 132: ...R5914712 00 SP2K C 132 Image 12 13 Tightening the screws of the side cover Projector covers...
Page 140: ...R5914712 00 SP2K C 140 Dimensions...
Page 146: ...R5914712 00 SP2K C 146 Restriction Zone clarification and use cases...
Page 150: ...R5914712 00 SP2K C 150 List of tools...
Page 154: ...R5914712 00 SP2K C 154 Index...
Page 155: ......