
R5914712 /00
SP2K-C
42
4.3 Power input configuration of the projector
About the power input.
The power input of the projector can be configured in one of three different configurations, depending on the
local power supply:
•
In a
Y configuration
(3W+N+PE) for a three phase power supply of 200-240 V / 346-415 V. In this
configuration, 346-415 V is measured between the lines while 200-240V is measured between the lines
and the neutral.
•
In a
Δ configuration
(3W+PE) for a three phase power supply of 200-240 V. In this configuration, 200-240
V is measured between the lines.
•
In a
mono phase configuration
(L1+N+PE) for a mono phase power supply of 200-240 V. In this
configuration, 200-240 V is measured between L1 and the neutral (N) or L2.
Before operating the projector, place the links in the correct position depending on the local power supply.
W2
U1
U2
V1
V2
W1
Δ
MONO
W2
U1
U2
V1
V2
W1
W2
U1
U2
V1
V2
W1
Y
Image 4–6 From left to right: Y configuration, Δ configuration and mono phase configuration
Required tools
•
Nut driver 10 mm
•
Torque wrench with 10 mm hexagon socket
How to switch configurations
1.
Loosen the top nuts on all the Υ / Δ / mono configuration pins. (U1, U2, V1, V2, W1 and W2). Use a 10 mm
nut driver.
Image 4–7
2.
Take off the four mounted links (A, B, C and D).
3.
Mount the links as illustrated, depending on the configuration:
1.
Y configuratio
n: Connect the upper pins with each other. Place two links between each pin (do not
remove them).
Summary of Contents for SP2K-C
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP2K C...
Page 4: ......
Page 8: ...R5914712 00 SP2K C 8...
Page 48: ...R5914712 00 SP2K C 48 Physical installation projector...
Page 62: ...R5914712 00 SP2K C 62 Lenses Lens holder...
Page 70: ...R5914712 00 SP2K C 70 ICMP X...
Page 90: ...R5914712 00 SP2K C 90 ICMP X...
Page 98: ...R5914712 00 SP2K C 98 Projector Power Cycle...
Page 104: ...R5914712 00 SP2K C 104 Connectivity...
Page 107: ...107 R5914712 00 SP2K C Image 10 3 Sealed top cover remove Convergence...
Page 109: ...109 R5914712 00 SP2K C 1 1 Image 10 6 Sealed cover fixation Convergence...
Page 116: ...R5914712 00 SP2K C 116 Convergence...
Page 132: ...R5914712 00 SP2K C 132 Image 12 13 Tightening the screws of the side cover Projector covers...
Page 140: ...R5914712 00 SP2K C 140 Dimensions...
Page 146: ...R5914712 00 SP2K C 146 Restriction Zone clarification and use cases...
Page 150: ...R5914712 00 SP2K C 150 List of tools...
Page 154: ...R5914712 00 SP2K C 154 Index...
Page 155: ......