8. ICMP
Image 8-17
5. Switch on the projector.
In case you replace one HDD (e.g. degraded mode) the ICMP automatically starts with the RAID recovery
process. The red LED of the HDD which has to be rebuilt is blinking. This process takes about 200 GB per
hour. Once the RAID is completed the red LED turns off.
C
AUTION
:
It’s strongly recommended to complete the RAID recovery process prior to starting a show. This
to ensure that the content integrity is preserved and that the show is not interrupted.
R5906693 DP2K-E SERIES 19/06/2015
67
Summary of Contents for DP2K-E series
Page 1: ...DP2K E series User and installation manual R5906693 01 19 06 2015...
Page 16: ...2 Safety PR Image 2 2 12 R5906693 DP2K E SERIES 19 06 2015...
Page 18: ...2 Safety 14 R5906693 DP2K E SERIES 19 06 2015...
Page 34: ...5 Physical installation 30 R5906693 DP2K E SERIES 19 06 2015...
Page 42: ...6 Lenses Lens selection 38 R5906693 DP2K E SERIES 19 06 2015...
Page 72: ...8 ICMP 68 R5906693 DP2K E SERIES 19 06 2015...
Page 82: ...10 Starting up 78 R5906693 DP2K E SERIES 19 06 2015...
Page 94: ...11 Scheimpflug 90 R5906693 DP2K E SERIES 19 06 2015...
Page 99: ...12 Convergence 4 1 2 5 3 6 Image 12 4 R5906693 DP2K E SERIES 19 06 2015 95...
Page 114: ...14 Preventative maintenance actions 110 R5906693 DP2K E SERIES 19 06 2015...
Page 122: ...15 Maintenance procedures 118 R5906693 DP2K E SERIES 19 06 2015...
Page 140: ...16 Removal and installation of the projector covers 136 R5906693 DP2K E SERIES 19 06 2015...
Page 156: ...18 Pin configurations 152 R5906693 DP2K E SERIES 19 06 2015...