+
_
12 V DC
T
3
4
4
6
2
1
T
5
1
NMEA 2000 device
2
Connector to unit
3
Drop-cable, should not exceed 6 m (20 ft)
4
Terminators
5
Backbone
6
Power cable
CZone connection to NMEA 2000
When interfacing to CZone network it is recommended to use a BEP
Network interface bridge to join the two network backbones
together.
The CZone / NMEA 2000 Network interface bridge isolates the
power of the two networks, but allows data to be freely shared
between both sides.
The Interface Bridge can also be used for expansion of the NMEA
2000 network, when the maximum node limit (node = any device
connected to network) for the network has been reached or the
maximum cable length of 150 m will be exceeded. Once an
Interface Bridge has been fitted, a further 40 nodes and additional
cable length can be added.
Wiring
| Vulcan Series Installation Manual
27
Summary of Contents for Vulcan Series
Page 1: ...ENGLISH VulcanSeries Installation Manual bandg com...
Page 2: ......
Page 8: ...8 Preface Vulcan Series Installation Manual...
Page 64: ...988 11099 001 0980...