BURNER CONNECTION TO THE BOILER
•
Adjust the position of the coupling flange (19) by loosening the
screws (6) so that the burner head enters the furnace to the
extent recommended by the generator manufacturer.
•
Position the insulating gasket (13) on the sleeve, by inserting
the cord (2) between the flange and the gasket.
•
Fasten the head unit to the boiler(1) by means of the stud bolts,
washers and the nuts provided (7).
DANGER / ATTENTION
Seal the space between the burner sleeve and the hold on
the refractory material inside the boiler door completely with
suitable material.
ASSEMBLY OF VENTILATION SYSTEM
For a correct installation of the ventilating body, follow the
procedure described below:
Position the half-hinge on the burner scroll in line with those on the
combustion head assembly.
•
Insert the hinge pin (10) in the position considered most suitable
•
Connect the ignition cable to the relevant electrode, close the
hinge by fastening the burner with the screws (11).
COMPLETING BURNER SETUP
•
Remove the protective (black) caps from the fittings placed
beneath the head unit and near the solenoid valves.
•
Connect the light oil pipes (24) provided with the burner to
their corresponding connectors, making sure they are properly
sealed.
DANGER / ATTENTION
Do not change the tie rod factory positions.
1 13
2
25
7
6
0002935100
10
11
24
00029351
10
Summary of Contents for TBL 210P
Page 2: ......
Page 38: ...ITALIANO 36 38 0006081053_201805 SCHEMI ELETTRICI...
Page 39: ...ITALIANO 37 38 0006081053_201805...
Page 76: ...ENGLISH 36 38 0006081053_201805 WIRING DIAGRAMS...
Page 77: ...ENGLISH 37 38 0006081053_201805...
Page 79: ......