ASSEMBLING THE GAS TRAIN
The gas train can be assembled in different ways: (1), (2), (3).
The burner is supplied with the gas train connection facing downward.
If you wish to invert the direction of train entrance to allow the gas train
to be assembled in configuration (1) follow the procedure described
in the section entitled: “Preparation for connection with train turned
upward”.
Choose the most rational position for the set-up of the boiler room and
the position in which the gas pipeline arrives.
PREPARATION FOR CONNECTING THE TRAIN TURNED
UPWARD
0002936660
1
2
3
16
17
0002936600
15
14
18
8
19
20
0002936610
12 / 34
0006160178_202211
ENGLISH
Summary of Contents for TBG 45 P
Page 2: ......
Page 33: ...SCHEMI ELETTRICI 31 34 0006160178_202211 ITALIANO...
Page 34: ...32 34 0006160178_202211 ITALIANO...
Page 36: ...34 34 0006160178_202211 ITALIANO...
Page 67: ...WIRING DIAGRAMS 31 34 0006160178_202211 ENGLISH...
Page 68: ...32 34 0006160178_202211 ENGLISH...
Page 70: ...34 34 0006160178_202211 ENGLISH...
Page 71: ......