MAINTENANCE TIME
Part description
Action to be performed
Gas
COMBUSTION HEAD
ELECTRODES
VISUAL INSPECTION OF THE INTEGRITY OF CERAMICS. TIP GRINDING, CHECK DISTANCE, CHECK
ELECTRICAL CONNECTION
YEAR
FLAME DISC
INTEGRITY VISUAL CHECK FOR ANY DEFORMATIONS, CLEANING,
YEAR
IONISATION PROBE
VISUAL INSPECTION OF THE INTEGRITY OF CERAMICS. TIP GRINDING, CHECK DISTANCE, CHECK
ELECTRICAL CONNECTION
YEAR
COMBUSTION HEAD
COMPONENTS
INTEGRITY VISUAL CHECK FOR ANY DEFORMATIONS, CLEANING,
YEAR
INSULATING GASKET
SEAL VISUAL INSPECTION AND POSSIBLE REPLACEMENT
YEAR
GAS DELIVERY COUPLING SEAL
SEAL VISUAL INSPECTION AND POSSIBLE REPLACEMENT
YEAR
AIR LINE
AIR GRILLE/DAMPERS
CLEANING
YEAR
AIR DAMPER BEARINGS
GREASING, (Note: apply only on burners with bearings requiring lubrication)
YEAR
FAN
FAN AND SCROLL CLEANING, DRIVE SHAFT GREASING
YEAR
AIR PRESSURE SWITCH
CLEANING
YEAR
AIR PRESSURE PORT AND PIPES
CLEANING
YEAR
SAFETY COMPONENTS
FLAME SENSOR
CLEANING
YEAR
GAS PRESSURE SWITCH
FUNCTIONAL INSPECTION
YEAR
VARIOUS COMPONENTS
ELECTRIC MOTORS
COOLING FAN CLEANING, BEARING NOISE CHECK
YEAR
MECHANICAL CAM
CHECK OF WEAR AND OPERATION, GREASING OF SLIDING BLOCK AND SCREWS
YEAR
LEVERS/TIE-RODS/BALL JOINTS
CHECK OF ANY WEAR, COMPONENT LUBRICATION
YEAR
ELECTRICAL SYSTEM
CHECK OF CONNECTIONS AND TERMINAL TIGHTENING
YEAR
INVERTER
COOLING FAN CLEANING AND TERMINAL TIGHTENING
YEAR
CO PROBE
CLEANING AND CALIBRATION
YEAR
O2 PROBE
CLEANING AND CALIBRATION
YEAR
COMBUSTION HEAD EXTRACTION
KIT
CHECKING WEAR AND OPERATION
YEAR
FUEL LINE
GAS FILTER
REPLACING THE FILTERING ELEMENT
YEAR
HYDRAULIC/GAS SEALS
CHECK OF ANY LEAKAGES
YEAR
COMBUSTION PARAMETERS
CO CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
CO2 CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
BACHARACH SMOKE INDEX
CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
n.a.
NOX CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
IONISATION CURRENT CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
SMOKE TEMPERATURE CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
GAS PRESSURE REGULATOR
PRESSURE MEASURED AT START-UP
YEAR
IMPORTANT
In case of heavy-duty operation or when using special fuels, the maintenance intervals must be reduced adapting them to the real
operating conditions, according to the indications of the maintenance technician.
26 / 34
0006160178_202211
ENGLISH
Summary of Contents for TBG 45 P
Page 2: ......
Page 33: ...SCHEMI ELETTRICI 31 34 0006160178_202211 ITALIANO...
Page 34: ...32 34 0006160178_202211 ITALIANO...
Page 36: ...34 34 0006160178_202211 ITALIANO...
Page 67: ...WIRING DIAGRAMS 31 34 0006160178_202211 ENGLISH...
Page 68: ...32 34 0006160178_202211 ENGLISH...
Page 70: ...34 34 0006160178_202211 ENGLISH...
Page 71: ......