18
Mechanical Access Platform (Optional)
Refer to
Figures 25
to
33
for your unit platform assembly.
1. Lift the hang-on module(s) into place by placing the hangers into the notches at the
top of the unit. Secure the module(s) to the unit using 3/8” bolts provided. See
Detail
A
(
Figures 25
to
33
).
2. Slide the platform clamps behind the panel flanges and secure to platform. See
Details B
and
C
(
Figures 25
to
33
).
3. Secure the adjustable extension to the flange at the top of the lower section as shown
in
Detail D
(
Figures 25
to
33
).
4. If applicable, lift the bridge section(s) between the mounted hang-on modules and
lower into position so that it rests on support channels. Fasten the bridge section(s) to
the support chancels at 4 places using 3/8” x 1 1/4” hardware supplied. See
Detail E
(
Figures 26, 27, 29, 30, 31, 32, and 33
).
Detail A
Figure 25.
Mechanical Access Platform for One Cell Units (Except for PT2-1218)
Detail B
Detail C
Detail D
A
B
C
D
Hanger