
PT2 Cooling Towers should be rigged and assembled
as outlined in this manual.
These procedures should be thoroughly reviewed prior to the
actual rigging and assembly of the equipment to acquaint
all personnel with procedures to be followed and to ensure
that all necessary equipment will be available beforehand.
If outstanding circumstances require a departure from the
procedures outlined in this manual, contact your local BAC
Representative for guidance.
Be sure to have a copy of the submittal drawings available for reference.
If you do not have a copy of these drawings, or if you need additional
information about this unit, contact your local BAC Representative whose
name and telephone number are on the outside of the cold water basin. The
model number and serial number of the unit are also located in this area.