PT2 COOLING TOWER
Introduction
Introduction
Safety
Shipping
Pre-Rigging Checks
Unit Weights
Anchoring
Cold Weather Operation
Location
Warranties
Unit Weights
Before rigging any unit, the weight of each section should be verified from the unit
submittal drawing. Unit print weights include the final assembled tower with all
accessories. Accessory weights (found on the respective drawing) can be deducted from
the total weight.
Anchoring
Seven-eighths inch (7/8”) diameter holes are provided in the bottom flange of the basin
section for bolting the unit to the support beams. Refer to the suggested support drawing
included in the submittal for location and quantity of the mounting holes.
The unit must
be level for proper operation
. Anchor bolts must be provided by others. The IBC rating is
only certified with standard anchorage locations. Using alternate anchorage locations or
alternate steel supports will void any IBC wind or seismic ratings. Contact your local BAC
Representative for details.
Cold Weather Operation
These products must be protected by mechanical and operational methods against damage
and/or reduced effectiveness during sub-freezing temperatures Please refer to the
Common
Operation & Maintenance Manual
available at www.BaltimoreAircoil.com, or contact your
local BAC Representative for recommended cold weather operation strategies.
Location
All evaporative cooling equipment must be located to ensure an adequate supply of fresh
air to the fans. When units are located adjacent to walls or in enclosures, care must be
taken to ensure the warm, saturated, discharge air is not deflected and recirculated back
to the air intakes.
Each unit must be located and positioned to prevent the introduction of discharge air
into the ventilation systems of the building on which the unit is located and of adjacent
buildings. For detailed recommendation on BAC equipment layout, see our website at
www.BaltimoreAircoil.com or contact your local BAC Representative.
Warranties
Please refer to the Limitation of Warranties (located in the submittal package) applicable
to and in effect at the time of the sale/purchase of these products.
Unit Operation
Prior to start-up and unit operation, refer to the
PT2 Operation & Maintenance Manual
shipped with the unit and also available at www.BaltimoreAircoil.com
NOTICE:
Before an actual lift is
undertaken, ensure no water,
snow, ice, or debris has collected
in the basin or elsewhere in the
unit. Such accumulations will add
substantially to the equipment’s
lifting weight.