PT2 COOLING TOWER

Optional Accessory Installation

3

Side Outlet Depressed Sump Box (Optional)

The optional side outlet depressed sump box allows a cooling tower water outlet 
connection to be piped from underneath the unit in four possible directions, 90° apart. 
The piping connection is a bolt circle designed to fit an ASME Class 150 flat flange with a 
full-face gasket. To install the side outlet depressed sump box, follow the steps below.

1.  Wipe the edges around the opening inside the cold water basin to remove any dirt or 

moisture that may have accumulated during shipment.

2.  Apply a layer of 1/8” x 1” butyl sealer tape around the opening in the basin over 

the centerline of the holes. Do not stretch the sealer tape too thinly or overlap at the 
corners. When it is necessary to splice the sealer tape, be sure to press the two ends 
together to form a smooth continuous strip. Apply a second layer of sealer tape over 
the first layer following the same procedure. Refer to 

Figure 17

. The sealer tape needs 

to be positioned between the sump box and the inside basin bottom.

3.  Insert the sump box assembly into the opening in the cold water basin and attach it 

to the basin with 3/8” x 1” bolt and nuts, flat washers, and lock washers as shown in 

Figure 17, Detail A

.

4.  Place the suction strainer over the opening as shown in 

Figure 17

.

Side Outlet 
Depressed 
Sump Box

Sump Suction
Strainer Standard
(Optional for Remote 
Sump Applications)

Cold

Water

Basin

Butyl

Sealer 

Tape

Lockwasher
& 3/8" Nut

3/8" X 1" Bolt
& Flatwasher

Butyl
Sealer Tape

Figure 17. 

Installation of Side Outlet Depressed Sump Box

Detail A

Summary of Contents for PT2 Series

Page 1: ...RIGGING ASSEMBLY INSTRUCTIONS PT2 Cooling Tower PT2...

Page 2: ...nd If outstanding circumstances require a departure from the procedures outlined in this manual contact your local BAC Representative for guidance Be sure to have a copy of the submittal drawings avai...

Page 3: ...erized Units 6 Multi Cell Unit Installation 9 Motor Installation for PT2 0709 PT2 0809 PT2 0812 and PT2 0814 10 Fan Guard Installation 3 Optional Accessory Installation 12 Side Outlet Depressed Sump B...

Page 4: ...been received and are free of any shipping damage prior to signing the bill of lading The following parts should be inspected Sheaves and Belts Bearings Bearing Supports Fan Motor s Fan Guard s Fan s...

Page 5: ...atures Please refer to the Common Operation Maintenance Manual available at www BaltimoreAircoil com or contact your local BAC Representative for recommended cold weather operation strategies Location...

Page 6: ...2 1009 10 14 14 14 14 PT2 1012 10 16 14 14 14 PT2 1212 12 16 16 16 16 PT2 1214 12 18 18 18 18 PT2 1218 12 18 18 18 18 Figure 2 Upper Section Two Piece Lift Table 1 Minimum Vertical Dimension and Sprea...

Page 7: ...sin 2 Figures 2 and 3 show the proper rigging of the sections for units that ship in two sections Position the lower section on the steel support and bolt in place No foam seal tape is required on the...

Page 8: ...attach the motor to the fan section per Motor Installation Instructions on page 9 Rigging of Containerized Units Models PT2 0709 1 Remove the unit from the container 2 Containerized units ship in two...

Page 9: ...ent draw Cell 2 tight against the flume box ensuring that the spacing between the cells at the bottom basin flange is 1 6 As illustrated in Figure 9 insert 3 8 x 1 1 4 thread cutting screws in each ho...

Page 10: ...bly Detail A Figure 12a Step 1 Figure 12b Step 2 Figure 12c Step 3 Lower Baffle Side Baffle 1 4 Screw Water Baffle Installation Figures 12a 12b and 12c For multi cell PT2 Cooling Towers excluding Fact...

Page 11: ...e the panel support to the support bracket with 5 16 self tapping screws 3 Secure the partition to the panel support using 5 16 self tapping screws The panel should be flush with the top of the panel...

Page 12: ...for other PT2 models may ship unmounted One Piece Fan Guard Mount the fan guard to the unit as illustrated in Figure 15 Detail A Figure 15 One Piece Fan Guard Assembly DANGER Fan guard must be secure...

Page 13: ...two halves of the fan guard together as illustrated in Figure 16 Detail B Locate the U bolt assemblies along the seam between the two guard halves per the X and Y dimension provided in Table 2 which...

Page 14: ...holes Do not stretch the sealer tape too thinly or overlap at the corners When it is necessary to splice the sealer tape be sure to press the two ends together to form a smooth continuous strip Apply...

Page 15: ...is typical for all bottom outlets equalizers and bypasses Flange mounting hardware and gasket to be supplied by others 2 Bottom connection seal kit s ship in plastic tubs Cold Water Basin Sump Suctio...

Page 16: ...xtensions Detail A Discharge Sound Attenuation Optional on PT2 0412 Only 1 Verify the mounting guides 8 total are factory installed 2 Lower the attenuator assembly into position as shown in Figure 20...

Page 17: ...e the davit assembly to align the bolt head on the davit with the keyway in the upper support channel and lower into position The davit must pass through the upper and lower support channels and rest...

Page 18: ...the holes positioned on top Capture down break on channel between the bracket and adapter 4 Do not tighten the fasteners until the ladder is in position 5 Position the ladder on the upper bracket and...

Page 19: ...ure 24 Inclined Access Ladders for PT2 1009 PT2 1012 PT2 1212 and PT2 1218 Detail A Detail D Upper Bracket See Details B and C in Figure 22 Center Bracket Adapter Figure 23 Inclined Access Ladder for...

Page 20: ...secure to platform See Details B and C Figures 25 to 33 3 Secure the adjustable extension to the flange at the top of the lower section as shown in Detail D Figures 25 to 33 4 If applicable lift the b...

Page 21: ...on Mechanical Access Platform Detail B Figure 26 Mechanical Access Platform for Two Cell Units Except PT2 1218 Figure 27 Mechanical Access Platform for Three Cell Units Except PT2 1218 A B C D E A B C...

Page 22: ...EAIRCOIL COM 20 Detail E Detail A Detail B Detail C Detail D Hanger Figure 28 Mechanical Access Platform for PT2 1218 with One Fan A B C D Figure 29 Mechanical Access Platform for PT2 1218 with Two Fa...

Page 23: ...AIRCOIL COM 21 Optional Accessory Installation Mechanical Access Platform Detail E Detail A Detail C Detail D Hanger Detail B Figure 30 Mechanical Access Platform for PT2 1218 with One Fan and Two Cel...

Page 24: ...WWW BALTIMOREAIRCOIL COM 22 Detail E Detail A Detail C Detail D Hanger Detail B Figure 31 Mechanical Access Platform for PT2 1218 with Two Fans and Two Cells A B C D E...

Page 25: ...IRCOIL COM 23 Optional Accessory Installation Mechanical Access Platform Figure 32 Mechanical Access Platform for PT2 1218 with One Fan and Three Cells Detail E Detail A Detail C Detail D Hanger Detai...

Page 26: ...WWW BALTIMOREAIRCOIL COM 24 Figure 33 Mechanical Access Platform for PT2 1218 with Two Fans and Three Cells Detail E Detail A Detail C Detail D Hanger Detail B A B C D E...

Page 27: ...atwashers and locknuts on all fasteners 3 Attach the lower support assembly using the ladder clips provided 4 Check and tighten all ladder fasteners before using the ladder Detail A Figure 34 Mechanic...

Page 28: ...WWW BALTIMOREAIRCOIL COM 26 Figure 35 Mechanical Access Platform Ladder Installation for PT2 1218 One Fan Units Detail C Detail A Detail B...

Page 29: ...D Figure 36 Safety Cage Detail A Detail B Detail C Cage Height ft Bolting Location Cage Height ft Bolting Location Cage Height ft Bolting Location A B C D A B C D A B C D 4 1 1 12 1 1 2 1 20 1 1 4 1...

Page 30: ...in the heater control panel Basin Accessories Optional Basin accessories are not factory installed and will be located in a box inside the unit or secured to the interior of the unit Refer to the subm...

Page 31: ...breaker should be sized per NEC or local code requirements 4 Connect the incoming power wire conduit to the incoming power hub provided on the control panel Make sure the connection is water tight and...

Page 32: ...WERS ICE THERMAL STORAGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS SERVICES w w w B a l t i m o r e A i r c o i l c o m 7600 Dorsey Run Road Jessup MD 20794 Telephone 410 799 6200 Fax 410 799 6416...

Reviews: