Basic Installation 3-3
MN1919
3.2 Mechanical installation and cooling requirements
It is essential that you read and understand this section before beginning the
installation
.
CAUTION
: To prevent equipment damage, be certain that the input power has
correctly rated protective devices installed.
CAUTION
: To prevent equipment damage, be certain that input and output signals
are powered and referenced correctly.
CAUTION
: To ensure reliable performance of this equipment be certain that all
signals to/from the MicroFlex are shielded correctly.
CAUTION
: Avoid locating the MicroFlex immediately above or beside heat generating
equipment, or directly below water steam pipes.
CAUTION
: Avoid locating the MicroFlex in the vicinity of corrosive substances or
vapors, metal particles and dust.
CAUTION
: Failure to meet cooling air flow requirements will result in reduced product
lifetime and/or drive overtemperature trips.
The safe operation of this equipment depends upon its use in the appropriate environment.
The following points must be considered:
H
The MicroFlex must be installed indoors, permanently fixed and located so that it can only
be accessed by service personnel using tools.
H
The maximum suggested operating altitude is 1000m (3300ft).
H
The MicroFlex must be installed where the pollution degree according to IEC664 shall not
exceed 2.
H
The 24VDC control circuit supply must be installed so that the 24VDC supplied to the unit
is isolated from the AC supply using double or reinforced insulation.
H
The input of the control circuit must be limited to Safety Extra Low Voltage circuits.
H
Both the AC supply and the 24VDC supply must be fused.
H
The atmosphere must not contain flammable gases or vapors.
H
There must not be abnormal levels of nuclear radiation or X-rays.
H
To comply with CE directive 89/336/EEC an appropriate AC filter must be installed.
H
The MicroFlex must be secured by the slots in the flange. The protective earth/ground (the
threaded hole on the top of the MicroFlex) must be bonded to a safety earth/ground using
either a 25A conductor or a conductor of three times the peak current rating - whichever is
the greater.
H
The threaded holes in the top and bottom of the case are for cable clamps. The holes are
threaded for M4 bolts no longer than 11mm (0.43 in) in length.
H
Each D-type connector on the front panel of the MicroFlex is secured using two hexagonal
jack screws (sometimes known as “screwlocks”). If a jack screw is removed accidentally
or lost it must be replaced with a jack screw with an external male threaded section no
longer than 10mm (0.4 in).
Summary of Contents for MicroFlex
Page 1: ...MicroFlex Servo Control SERVO DRIVE Installation Manual 03 10 MN1919...
Page 2: ......
Page 12: ...www baldormotion com 1 6 General Information MN1919...
Page 16: ...www baldormotion com 2 4 Introduction MN1919...
Page 40: ...www baldormotion com 3 24 Basic Installation MN1919...
Page 70: ...www baldormotion com 5 18 Input Output MN1919...
Page 82: ...www baldormotion com 6 12 Configuration MN1919...
Page 94: ...www baldormotion com 8 8 Specifications MN1919...
Page 120: ...Index MN1919...
Page 122: ...Comments MN1919 Thank you for taking the time to help us...
Page 123: ......