![Baldor GLC30 Installation & Operating Manual Download Page 21](http://html1.mh-extra.com/html/baldor/glc30/glc30_installation-and-operating-manual_3577753021.webp)
General Information 2-11
MN2408
Cooling System
Cooling System Checklist
A. Have noise considerations been taken into account?
B. Has system piping been properly sized?
C. Has system been properly protected from freeze up and corrosion?
D. Have standby equipment heaters been specified?
E. Have all electrically driven devices been connected to load side of EPS connection points?
F. Have system drain valves and air eliminators been installed?
The system consists of the cooling medium which is generally a solution of water and ethylene
glycol, a method of rejecting engine produced heat, and a means to transport cooling medium
between the engine and heat rejection system. The first determination is the type of cooling
system to use – radiator cooling or heat exchanger cooling.
Radiator Cooling
The first and simplest is the engine mounted radiator shown in Figure 2-8. The radiator, water
circulating pump, fan and fan drive are mounted to the generator set base rails by the factory.
This method of engine cooling is the most economical, but may require large ventilation vents
and ducts. An added advantage of this arrangement is that the cooling air removes radiated heat
from the engine, generator, and other equipment located in the emergency power system room.
The only remaining design work with the engine mounted radiator is arranging a method of
providing air to the room, and exhausting it from the radiator. See “Air Systems”.
Figure 2-8 Engine Mounted Radiator Cooled System With Wind/Noise Barrier
The radiator can be mounted remotely (not mounted directly at the engine). The remote/close
system uses the same radiator type except it is mounted in another room or outside the building,
but within close proximity to the genset. See Figure 2-9.
Figure 2-9 Remote Radiator Cooled System
Summary of Contents for GLC30
Page 12: ...2 2 General Information MN2408...
Page 32: ...2 22 General Information MN2408...
Page 42: ...3 10 Receiving Installation MN2408 Figure 3 4 Three Phase WYE and DELTA Connections...
Page 52: ...4 6 Operation MN2408 Figure 4 3 Engine Controller Inputs Outputs...
Page 64: ...4 18 Operation MN2408 Figure 4 4 Configuration Data Sheet j j j j j j j j j...
Page 86: ...A 10 Series GLC MN2408 Figure A 2 Customer Interface Connection Diagram MEC20 MEC2...
Page 87: ...Series GLC A 11 MN2408 Figure A 3 Customer Interface w o Breaker Power Connection Diagram...
Page 88: ...A 12 Series GLC MN2408 Figure A 4 Single Phase w o Breaker Connection Diagram...
Page 89: ...Series GLC A 13 MN2408 Figure A 5 Single Phase One Breaker Connection Diagram...
Page 90: ...A 14 Series GLC MN2408 Figure A 6 Single Phase Two Breaker Connection Diagram...
Page 95: ...Series GLC A 19 MN2408 Figure A 11 Three Phase Connection Diagram...
Page 96: ...A 20 Series GLC MN2408 Figure A 12 Three Phase Connection Diagram with PMG...
Page 97: ...Series GLC A 21 MN2408 Figure A 13 Three Phase Connection Diagram Wire 1 0 and larger...
Page 104: ...A 28 Series GLC MN2408 Figure A 20 Control Box Connections with MEC2 Controller...
Page 105: ...Series GLC A 29 MN2408 Figure A 21 Engine Wiring Woodward 4 3L GM...
Page 106: ...A 30 Series GLC MN2408 Figure A 22 Engine Wiring Woodward 5 7L GM...
Page 107: ...Series GLC A 31 MN2408 Figure A 23 Engine Wiring Woodward 8 1L GM...
Page 108: ...A 32 Series GLC MN2408...