BALDAN IMPLEMENTOS AGRÍCOLAS S/A.
SPDE CXP
- 39
Instruction Manual
SEED DISTRIBUTION SYSTEM
SEED DISTRIBUTOR
1-
Be aware of the amount of fertilizer and seed to be applied per (Ha) or (AA).
2-
Be aware of the row spacing of the seeder.
3-
Perform the calculation by Ha, dividing the Ha = 10,000 m² by the spacing to be
planted.
4-
If the calculation is done by AA, divide the AA = 24,200 m² by the spacing to be
planted.
5-
And finally, divide the amount of fertilizer and seed to be applied by the linear
meters.
6-
To gauge the weight, collect the fertilizer or seeds in 10 or more meters rotated
to do the weighing.
Ha = 10.000 m²
AA = 24.200 m²
Ponto 01
Ponto 02
Ponto 03
REGULATION FOR SEED DISTRIBUTION
PART II
TO CALCULATE THE AMOUNT OF FERTILIZER AND SEED
PER HA OR AA, ONE SHOULD:
Before beginning sowing, check that the distribution is correct in relation
to the distribution table of the previous page.
ATTENTION
Summary of Contents for SPDE CXP
Page 1: ...SPDE CXP 1 InstructionManual No Till Seed Drill Special SPDE CXP...
Page 2: ......
Page 4: ...No Till Seed Drill Special SPDE CXP...
Page 92: ...BALDANIMPLEMENTOSAGR COLASS A SPDE CXP 92 InstructionManual NOTES...
Page 93: ...BALDANIMPLEMENTOSAGR COLASS A SPDE CXP 93 InstructionManual NOTES...
Page 97: ......
Page 98: ...BALDANIMPLEMENTOSAGR COLASS A SPDE CXP 98 InstructionManual...