Safety
06|2020
EN
9
2 Safety
2.1 Intended
use
For installation in all types of swimming pool as a talking point, for
fitness training, as a wave or air bubble bath, for underwater
massage, after medical consultation, for endless no-turn
swimming.
Observing the following information is vital for intended use:
• This
manual
The pump/unit may only be operated within the application limits,
as specified in this manual. Use in water with a salt content
exceeding 0.5 g/l must be authorised by the manufacturer/
supplier.
Any other use or use exceeding this is
not
an intended use and
must first be authorised by the manufacturer/supplier.
2.1.1 Possible
misuse
•
Installing the pump/unit with stress on the pipes.
•
The pump/unit is not attached sufficiently.
•
Opening and servicing of the pump/unit by unqualified
personnel.
2.2 Personnel
qualification
This unit can be used by
children
aged 8 and over as well as by
persons with limited physical, sensory or mental capacity or by
people with a lack of experience or knowledge, provided that they
are supervised or have been instructed in the safe use of the unit
and understand the resulting dangers.
Children
may not play with
the unit. Cleaning and
user maintenance
may not be carried out
by
children
without supervision.
Ensure that the following work is only performed by trained
professionals with the following qualifications:
– For mechanical work, for example replacing ball bearings
or mechanical seals: qualified mechanics.
– For work on the electric system: electricians.
Ensure that the following requirements are fulfilled:
– Personnel who do not yet have the appropriate
qualifications must receive the required training before
being allowed to work on the system.
– The personnels' responsibilities, for example working on
the product, electric equipment or hydraulic systems, are
set based on their qualifications and the job description.
Summary of Contents for JET Perla
Page 3: ...DE DE Originalbetriebsanleitung Einh nge Gegenstromanlage...
Page 26: ...Installation 24 DE 06 2020 5 3 2 Schaltplan 3 400 230 V 50 Hz Abb 10...
Page 27: ...Installation 06 2020 DE 25 5 3 3 Schaltplan 1 230 V 50 Hz Abb 11...
Page 46: ......
Page 47: ...EN EN Translation of original operation manual Overhang counter swim unit...
Page 69: ...Installation 06 2020 EN 23 5 3 2 Wiring diagram 3 phase 400 230V 50 Hz Fig 10...
Page 70: ...Installation 24 EN 06 2020 5 3 3 Wiring diagram 1 phase 230V 50 Hz Fig 11...
Page 89: ...FR FR Traduction des instructions d utilisation originale Nage contre courant hors bord...
Page 112: ...Installation 24 FR 06 2020 5 3 2 Sch ma de c blage 3 400 230V 50 Hz Fig 10...
Page 113: ...Installation 06 2020 FR 25 5 3 3 Sch ma de c blage 1 230V 50 Hz Fig 11...
Page 133: ...NL NL Vertaling van de oorspronkelijke gebruikershandleiding Inhangtegenstroominstallatie...
Page 156: ...Installatie 24 NL 06 2020 5 3 2 Schakelschema 3 400 230V 50 Hz Afb 10...
Page 157: ...Installatie 06 2020 NL 25 5 3 3 Schakelschema 1 230V 50 Hz Afb 11...
Page 200: ...Instalaci n 24 ES 06 2020 5 3 2 Esquema de conexiones 3 400 230V 50 Hz Fig 10...
Page 201: ...Instalaci n 06 2020 ES 25 5 3 3 Esquema de conexiones 1 230V 50 Hz Fig 11...
Page 220: ......
Page 221: ...RU RU...
Page 226: ...6 RU 06 2020...
Page 227: ...06 2020 RU 7 1 1 1 1 2 1 3 1 3 1...
Page 228: ...8 RU 06 2020 1 2...
Page 229: ...06 2020 RU 9 2 2 1 0 5 2 1 1 2 2 8...
Page 230: ...10 RU 06 2020 2 3 2 4 2 5...
Page 231: ...06 2020 RU 11 2 6 2 7 2 7 1 2 7 2 2 7 3 VDE EVU DIN VDE 0100 702...
Page 232: ...12 RU 06 2020 2 7 4 70 C docugl 2 7 5 45 2 7 6 2 8 6 1 2 31...
Page 233: ...06 2020 RU 13 2 9 2 9 1 2 9 2 2 9 3 H 55 40 C...
Page 234: ...14 RU 06 2020 2 9 4 O 2 9 5 2 9 6 2 9 7 35 C 2 9 8 2 8 12 1...
Page 235: ...06 2020 RU 15 3 3 1 2 1 2 2 1 7 41 54 1 3 2 2 1 2 1 54 1 2...
Page 236: ...16 RU 06 2020 4 4 1 4 2 3...
Page 237: ...06 2020 RU 17 4 3 4 4...
Page 239: ...06 2020 RU 19 5 1 7 32 31 30 6 7 21 5 1 8 c 8 22 5 1 9 22 23 4...
Page 242: ...22 RU 06 2020 5 2 8 5 3 VDE EVU DIN VDE 0100 702 3 IFN 30...
Page 243: ...06 2020 RU 23 DIN EN 809 5 3 1 IFN 30 mA 1 230 3 400 16 A K 16 A 0 1 9...
Page 244: ...24 RU 06 2020 5 3 2 3 400 230 50 10...
Page 245: ...06 2020 RU 25 5 3 3 1 230 50 11...
Page 246: ...26 RU 06 2020 5 3 4 12 5 4 5 4 1...
Page 247: ...06 2020 RU 27 5 4 2 13 RUN S1 P P S2 L L FL FL FL FV...
Page 248: ...28 RU 06 2020 3 15 A T V 5 4 3 DIP 14 5 4 4 15 17...
Page 249: ...06 2020 RU 29 6 6 1 6 1 1 1 2 3...
Page 250: ...30 RU 06 2020 15 16...
Page 251: ...06 2020 RU 31 6 1 2 6 1 3 1 2 3...
Page 252: ...32 RU 06 2020 6 2 6 2 1 2 1 6 2 2 54 1 6 2 3 2 30 6 2 4 54...
Page 253: ...06 2020 RU 33 6 2 5 2 1 6 2 6 6 2 7 6 2 8 17...
Page 254: ...34 RU 06 2020 18 6 3 BADU Jet Perla BADU Jet Riva 1 2 1 2 3 4 5 2 1...
Page 255: ...06 2020 RU 35 BADU Jet Stella 1 2 1 2 3 4 5 6 2 1 6 4 1 2 6 4 1 35...
Page 256: ...36 RU 06 2020 7 7 1 7 1 1 38...
Page 257: ...06 2020 RU 37 6 1 2 31...
Page 258: ...38 RU 06 2020 7 1 1 1 2 1 2 1 2 3 4 5 7 1 2 www speck pumps com...
Page 259: ...06 2020 RU 39 8 6 1 29 8 1...
Page 260: ...40 RU 06 2020 8 2 DIN 3151 DIN EN 13306 8 2 1 8 3 www speck pumps com...
Page 261: ...06 2020 RU 41 9...
Page 263: ...06 2020 RU 43 10 1 BADU Jet Perla BADU Jet Riva 19 BADU Jet Stella 20...
Page 265: ...06 2020 45...
Page 266: ...46 06 2020...