Safety
06|2020 EN
11
2.7.2 Rotating
parts
There is a risk of shearing and crushing due to exposed rotating
parts.
Only perform servicing when the pump/unit is not in
operation.
Prior to servicing, ensure the pump/unit cannot be switched
back on.
Immediately after finishing servicing, reattach or reactivate all
protective equipment.
2.7.3 Electrical
energy
There is an increased risk of electric shock when working on the
electrical system due to the humid environment.
Electrical protective earth conductors which were not installed
correctly can also result in electric shocks, for example due to
oxidation or cable breakage.
Observe VDE and utility company regulations.
Build swimming pools and their protection according to
DIN VDE 0100-702.
Before working on the electrical system, take the following
measures:
– Disconnect system from the power supply.
– Attach a warning sign: “Do not switch on! The system is
being worked on.”
– Ensure that the system is free of voltage.
Check the electrical system regularly to ensure it is in proper
working condition.
2.7.4 Hot
surfaces
The electric motor can reach temperatures of up to 70 °C. There
is a risk of being burned.
Do not touch the motor during operation.
Allow the pump/unit to cool down before servicing it.
2.7.5 Suction
danger
The following dangers can result:
–
Sucking towards, sucking in or jamming of the body or body
parts, clothing, jewellery
–
Knotting of the hair
Maintain installation distance to the pool wall of
≤
45 mm
Never operate the system without a cover and light cover.
Do not wear loose swimwear.
Use a bathing cap if you have longer hair.
Check and clean the suction openings regularly.
Summary of Contents for JET Perla
Page 3: ...DE DE Originalbetriebsanleitung Einh nge Gegenstromanlage...
Page 26: ...Installation 24 DE 06 2020 5 3 2 Schaltplan 3 400 230 V 50 Hz Abb 10...
Page 27: ...Installation 06 2020 DE 25 5 3 3 Schaltplan 1 230 V 50 Hz Abb 11...
Page 46: ......
Page 47: ...EN EN Translation of original operation manual Overhang counter swim unit...
Page 69: ...Installation 06 2020 EN 23 5 3 2 Wiring diagram 3 phase 400 230V 50 Hz Fig 10...
Page 70: ...Installation 24 EN 06 2020 5 3 3 Wiring diagram 1 phase 230V 50 Hz Fig 11...
Page 89: ...FR FR Traduction des instructions d utilisation originale Nage contre courant hors bord...
Page 112: ...Installation 24 FR 06 2020 5 3 2 Sch ma de c blage 3 400 230V 50 Hz Fig 10...
Page 113: ...Installation 06 2020 FR 25 5 3 3 Sch ma de c blage 1 230V 50 Hz Fig 11...
Page 133: ...NL NL Vertaling van de oorspronkelijke gebruikershandleiding Inhangtegenstroominstallatie...
Page 156: ...Installatie 24 NL 06 2020 5 3 2 Schakelschema 3 400 230V 50 Hz Afb 10...
Page 157: ...Installatie 06 2020 NL 25 5 3 3 Schakelschema 1 230V 50 Hz Afb 11...
Page 200: ...Instalaci n 24 ES 06 2020 5 3 2 Esquema de conexiones 3 400 230V 50 Hz Fig 10...
Page 201: ...Instalaci n 06 2020 ES 25 5 3 3 Esquema de conexiones 1 230V 50 Hz Fig 11...
Page 220: ......
Page 221: ...RU RU...
Page 226: ...6 RU 06 2020...
Page 227: ...06 2020 RU 7 1 1 1 1 2 1 3 1 3 1...
Page 228: ...8 RU 06 2020 1 2...
Page 229: ...06 2020 RU 9 2 2 1 0 5 2 1 1 2 2 8...
Page 230: ...10 RU 06 2020 2 3 2 4 2 5...
Page 231: ...06 2020 RU 11 2 6 2 7 2 7 1 2 7 2 2 7 3 VDE EVU DIN VDE 0100 702...
Page 232: ...12 RU 06 2020 2 7 4 70 C docugl 2 7 5 45 2 7 6 2 8 6 1 2 31...
Page 233: ...06 2020 RU 13 2 9 2 9 1 2 9 2 2 9 3 H 55 40 C...
Page 234: ...14 RU 06 2020 2 9 4 O 2 9 5 2 9 6 2 9 7 35 C 2 9 8 2 8 12 1...
Page 235: ...06 2020 RU 15 3 3 1 2 1 2 2 1 7 41 54 1 3 2 2 1 2 1 54 1 2...
Page 236: ...16 RU 06 2020 4 4 1 4 2 3...
Page 237: ...06 2020 RU 17 4 3 4 4...
Page 239: ...06 2020 RU 19 5 1 7 32 31 30 6 7 21 5 1 8 c 8 22 5 1 9 22 23 4...
Page 242: ...22 RU 06 2020 5 2 8 5 3 VDE EVU DIN VDE 0100 702 3 IFN 30...
Page 243: ...06 2020 RU 23 DIN EN 809 5 3 1 IFN 30 mA 1 230 3 400 16 A K 16 A 0 1 9...
Page 244: ...24 RU 06 2020 5 3 2 3 400 230 50 10...
Page 245: ...06 2020 RU 25 5 3 3 1 230 50 11...
Page 246: ...26 RU 06 2020 5 3 4 12 5 4 5 4 1...
Page 247: ...06 2020 RU 27 5 4 2 13 RUN S1 P P S2 L L FL FL FL FV...
Page 248: ...28 RU 06 2020 3 15 A T V 5 4 3 DIP 14 5 4 4 15 17...
Page 249: ...06 2020 RU 29 6 6 1 6 1 1 1 2 3...
Page 250: ...30 RU 06 2020 15 16...
Page 251: ...06 2020 RU 31 6 1 2 6 1 3 1 2 3...
Page 252: ...32 RU 06 2020 6 2 6 2 1 2 1 6 2 2 54 1 6 2 3 2 30 6 2 4 54...
Page 253: ...06 2020 RU 33 6 2 5 2 1 6 2 6 6 2 7 6 2 8 17...
Page 254: ...34 RU 06 2020 18 6 3 BADU Jet Perla BADU Jet Riva 1 2 1 2 3 4 5 2 1...
Page 255: ...06 2020 RU 35 BADU Jet Stella 1 2 1 2 3 4 5 6 2 1 6 4 1 2 6 4 1 35...
Page 256: ...36 RU 06 2020 7 7 1 7 1 1 38...
Page 257: ...06 2020 RU 37 6 1 2 31...
Page 258: ...38 RU 06 2020 7 1 1 1 2 1 2 1 2 3 4 5 7 1 2 www speck pumps com...
Page 259: ...06 2020 RU 39 8 6 1 29 8 1...
Page 260: ...40 RU 06 2020 8 2 DIN 3151 DIN EN 13306 8 2 1 8 3 www speck pumps com...
Page 261: ...06 2020 RU 41 9...
Page 263: ...06 2020 RU 43 10 1 BADU Jet Perla BADU Jet Riva 19 BADU Jet Stella 20...
Page 265: ...06 2020 45...
Page 266: ...46 06 2020...