62
EAVE SIDE FASCIA
x36
2" (5,1 cm)
Repeat steps to install eave nailer and soffit boards on the opposite side.
1
BEGIN
2
You have finished installing your eave side fascia.
FINISH
PARTS REQUIRED:
Primed Side Out
2" (5,1 cm) Finish Nails
Flush with
roof panel
Fig.A
Flush
x2
3/8 x 4-3/4 x 77-1/4" (1 x 12,1 x 196,2 cm)
x2
3/8 x 4-3/4 x 96" (1 x 12,1 x 243,8 cm)
Place
77-1/4"
soffit board primed side down,
flush to gable trim unit and roof sheathing
(Fig A)
.
Secure with 2" finish nails, two in each rafter and two into face of
AO
as shown.
Place
96"
soffit board primed side down,
flush to gable trim unit and roof sheathing
(Fig A)
.
Secure with 2" finish nails, (2) in each rafter and (2) into face of
AO
as shown.
4-3/4" x 77-1/4"
4-3/4" x 96"